eEnergy announced the Group's first contract win to provide solar power together with LED lighting in a single contract. The contract is with British Gaskets Limited ("British Gaskets"), a UK based international manufacturer and supplier of gaskets, seals, plastic and rubber mouldings and materials. The initial, single site contract covers a solar power system, together with LED lighting, with a contract value of approximately £0.4 million. Over the 20 year lifetime of the system, the Board anticipates a total customer cost saving, at today's prices, of almost £1.4m and a reduction of CO2 emissions of approximately 576,000 tonnes. The Board continues to expect trading for the year ended 30 June 2022 to be in-line with current market expectations.