Electric Metals (USA) Limited announced the final assay results from the recent drilling program at the high-grade Emily Manganese Project, Minnesota, USA. Previously reported results from the first twenty diamond drill holes of the program described continuity of thick intervals of more than 30% manganese with a northerly dip and east-west strike direction. New results reported in this announcement are for an additional seven drill holes located on 100-meter collar spacing (23047, 23048, 23049, 23050, 23052, 23053 and 23054) which confirm that high-grade, thick manganese oxide mineralization (manganite) has not been closed at depth or along trend.

All seven drill holes intersected high-grade manganese with drilled intervals (approximate true thickness) of more than 20 meters. Data Summary: Analytical data on quartered PQ sized drill core from the 27 completed diamond drill holes at Emily comprise a total of 2,156.6 meters (7,075.5 feet) of drill core. Average assay data highlights for drill holes 23047, 23048, 23050, 23053 and 23054.

Forte Dynamics Inc. have commenced a NI43-101 resource update, and this is expected to be completed in late 2023.