TORONTO - Eloro Resources Ltd. (TSX-V: ELO; OTCQX: ELRRF FSE: P2QM) ('Eloro', or the 'Company') is pleased to provide an update on its Iska Iska silver-tin polymetallic project in Potosi Department, southern Bolivia.

To date, the Company has completed 46 diamond drill holes totalling 22,398.9 metres (m) to test major target areas at Iska Iska. This press release reports drilling results from four (4) additional holes which tested the mineralized envelope of the Santa Barbara Breccia Pipe ('SBBP') and the central-southern part of the Central Breccia Pipe ('CBP'). To date, every drill hole that has been assayed has returned multiple reportable mineralized intercepts. Currently three drill rigs are in operation at Iska Iska. One surface drill rig is completing first pass drilling of the major Porco (South) Target. The second surface drill is currently cleaning out drill holes on the SBBP radial platform for the planned downhole induced polarization/resistivity (IP/RES) survey then will be moved to test the gap area between the Central and Porco Breccia Pipes. The third drill, an underground rig, is testing the northeast part of SBBP and its mineralized envelope. This drill will shortly be moved to a new drill bay recently completed on the west end of the Santa Barbara adit.

About Iska Iska

Iska Iska silver-tin polymetallic project is a road accessible, royalty-free property, wholly-controlled by the Title Holder, Empresa Minera Villegas S.R.L. and is located 48 km north of Tupiza city, in the Sud Chichas Province of the Department of Potosi in southern Bolivia. Eloro has an option to earn a 99% interest in Iska Iska.

Iska Iska is a major silver-tin polymetallic porphyry-epithermal complex associated with a Miocene possibly collapsed/resurgent caldera, emplaced on Ordovician age rocks with major breccia pipes, dacitic domes and hydrothermal breccias. The caldera is 1.6km by 1.8km in dimension with a vertical extent of at least 1km. Mineralization age is similar to Cerro Rico de Potosi and other major deposits such as San Vicente, Chorolque, Tasna and Tatasi located in the same geological trend.

Eloro began underground diamond drilling from the Huayra Kasa underground workings at Iska Iska on September 13, 2020. On November 18, 2020 Eloro announced the discovery of a significant breccia pipe with extensive silver polymetallic mineralization just east of the Huayra Kasa underground workings and a high-grade gold-bismuth zone in the underground workings. On November 24, 2020, Eloro announced the discovery of the Santa Barbara Breccia Pipe ('SBBP') approximately 150m southwest of the Huayra Kasa underground workings.

Subsequently, on January 26, 2021, Eloro announced significant results from the first drilling at the SBBP including the discovery hole DHK-15 which returned 129.60 g Ag eq/t over 257.5m (29.53g Ag/t, 0.078g Au/t, 1.45%Zn, 0.59%Pb, 0.080%Cu, 0.056%Sn, 0.0022%In and 0.0064% Bi from 0.0m to 257.5m. Subsequent drilling has confirmed significant values of Ag-Sn polymetallic mineralization in the SBBP and the adjacent Central Breccia Pipe ('CBP'). The SBBP thus far extends 800m along strike by 400+m wide and extends to at least 700m depth. CBP extends for 700m along strike by 400+m wide and extends to at least 900m deep.

A substantive mineralized envelope which is open along strike and down-dip extends around the breccia pipes. Continuous channel sampling of the Santa Barbara Adit located to the east of SBBP returned 442 g Ag eq/t (164.96 gAg/t, 0.46%Sn, 3.46% Pb and 0.14% Cu) over 166m including 1,092 g Ag eq/t (446 g Ag/t, 9.03% Pb and 1.16% Sn) over 56.19m. The west end of the adit intersects the end of the SBBP.

On May 4, 2021, Eloro released results from the first drill hole on the CBP. Hole DCN-01 intersected multiple mineralized intercepts including 196.09 g Ag eq/t (150.25 g Ag/t, 0.10% Sn and 0.05 g Au/t) over 56.2m and containing 342.98 g Ag eq/t (274.0 g Ag/t, 0.16% Sn and 0.16 g Au/t) over 27.53m.

On May 26, 2021 Eloro released results from Hole DSB-07 drilled at -60 degrees to a depth of 683.4m to the southeast from the radial drill platform on SBBP which intersected multiple mineralized intercepts including: 122.66 grams silver equivalent/tonne ('g Ag eq/t') (35.05 g Ag/t, 0.72% Zn, 0.61% Pb, 0.11% Sn and 0.06 g Au/t) over 123.61m from 236.60m to 360.21m including 205.74 g Ag eq/t (92.30 g Ag/t, 0.57% Zn, 0.85% Pb, 0.18% Sn and 0.07 g Au/t) over 32.32m, from 317.21m to 349.53m.

105.41 g Ag eq/t (8.55 g Ag/t, 1.01% Zn, 0.48% Pb, 0.06% Sn and 0.38 g Au/t) over 173.58m from 449.87m to 623.45m including 199.77 g Ag eq/t (21.90 g Ag/t, 1.18% Zn, 0.93% Pb 0.12% Sn and 0.94 g Au/t) over 39.08m, from 551.19m to 590.27m.

146.19 g Ag eq/t (1.70 g Ag/t, 0.00% Zn, 0.01% Pb, 0.42% Sn and 0.02 g Au/t) over 10.20m from 171.60m to 181.80m in the oxide zone indicating potential for significant Sn mineralization in this strongly leached nearer surface zone.

In aggregate, 64% of this 683.4m long hole returned reportable mineralized intervals.

About Eloro Resources Ltd.

Eloro is an exploration and mine development company with a portfolio of gold and base-metal properties in Bolivia, Peru and Quebec. Eloro has an option to acquire a 99% interest in the highly prospective Iska Iska Property, which can be classified as a polymetallic epithermal-porphyry complex, a significant mineral deposit type in the Potosi Department, in southern Bolivia. Eloro commissioned a NI 43-101 Technical Report on Iska Iska, which was completed by Micon International Limited and is available on Eloro's website and under its filings on SEDAR. Iska Iska is a road-accessible, royalty-free property. Eloro also owns an 82% interest in the La Victoria Gold/Silver Project, located in the North-Central Mineral Belt of Peru some 50 km south of Barrick's Lagunas Norte Gold Mine and Pan American Silver's La Arena Gold Mine. La Victoria consists of eight mining concessions and eight mining claims encompassing approximately 89 square kilometres. La Victoria has good infrastructure with access to road, water and electricity and is located at an altitude that ranges from 3,150 m to 4,400 m above sea level.

Contact:

Jorge Estepa

Tel: (416) 868-9168

Information in this news release may contain forward-looking information. Statements containing forward looking information express, as at the date of this news release, the Company's plans, estimates, forecasts, projections, expectations, or beliefs as to future events or results and are believed to be reasonable based on information currently available to the Company. There can be no assurance that forward-looking statements will prove to be accurate. Actual results and future events could differ materially from those anticipated in such statements. Readers should not place undue reliance on forward-looking information.

(C) 2021 Electronic News Publishing, source ENP Newswire