Corporate
Presentation
November 2021
Disclaimer
This presentation may contain certain forward-looking statements and information relating to Eneva that reflect the current views and/or expectations of the Company and its management with respect to its performance, business and future events. Forward looking statements include, without limitation, any statement that may predict, forecast, indicate or imply future results, performance or achievements, and may contain words like "may", "plan", "believe", "anticipate", "expect", "envisages", "will likely result", or any other words or phrases of similar meaning.
Such statements are subject to a number of risks, uncertainties and assumptions. We caution you that a number of important factors could cause actual results to differ materially from the plans, objectives, expectations, estimates and intentions expressed in this presentation.
In no event, neither the Company, any of its affiliates, directors, officers, agents or employees nor any of the placement agents shall be liable before any third party (including investors) for any investment or business decision made or action taken in reliance on the information and statements contained in this presentation or for any consequential, special or similar damages.
Recipients of this presentation are not to construe the contents of this summary as legal, tax or investment advice and recipients should consult their own advisors in this regard.
This presentation and its contents are proprietary information and may not be reproduced or otherwise disseminated in whole or in part without Eneva's prior written consent.
About Us
Integrated electric power generation and E&P company with access to onshore gas
2.8 GW | 30.8 bcm1 |
Installed | Certified Remaining Gas |
Capacity | Reserves (2P) |
(09/30/21) | |
9 TPPs | 11 natural gas fields2 |
~64,000 km² of exploratory areas | |
(3 under construction) | |
across 4 sedimentary basins | |
R$ 4.7 bi | R$ 2.0 bi |
Net Revenues | |
LTM 3Q21 EBITDA | |
3Q21 LTM | |
Dispersed Control
Others
44.03% | BTG Pactual |
ENEV3 21.53%
1.3 Bi
ON shares
Dynamo | Cambuhy | |
6.25% | Atmos | 22.88% |
5.31% |
Highest Governance | Present in relevant Brazilian |
standard at B3 | market indexes |
Notes: 1 - Gaffney Cline & Associates: Reserves and resources certification reports as of 12/31/2020 (Parnaíba Basin reserves) and 06/30/2021 (Amazonas Basin reserves), excluding the accumulated consumption of the Parnaíba Complex until 3Q21; 2 - Considers Gavião Belo Field..
3
About us
Successful turnaround track record
Proven track record of opportunistic capital allocation reflected into share price
Acquisition of | A-6 2019 Auction | |
100% of | Parnaíba VI TPP | 11/29/21 |
Pecém II TPP | ||
ENEV3: |
R$ 14.26
Azulão Field | A-6 2018 Auction: | ||||
Farm-in | |||||
Parnaíba V TPP | |||||
Apr-18 | Aug-18 | Oct-19 | |||
May-19 | Dec-19 | ||||
Gas monetization | Firm Energy Increase1 of the | ||||
Isolated Systems Auction | following TPPs: | ||||
Parnaíba I: 130 AverageMW | |||||
Jaguatirica II TPP | |||||
Parnaíba III: 30 AverageMW | |||||
10/20/17
ENEV3:
R$ 3.44 | Nota: 1 - Firm Energy corresponds to the maximum amount of energy a power plant can sell. | 4 |
Our Assets
Installed capacity of 2.8 GW
in strategic regions
2.2 GW of installed capacity in operation and 0.6 GW under construction to start operations as of the end of 2021. Projects located in strategic regions with barriers to market entry
Operating assets connected to the National Interconnected System
91% of total energy commercialized in the Regulated Market
MA | CE | Parnaíba Complex | |
Integrated model in the state of | |||
Maranhão | |||
▪ 6 gas-fired power plants | (2 | ||
under construction) |
- 10 onshore natural gas fields¹, with remaining 2P reserves of 24.4 bcm2
Itaqui: 360 MW
Pecém II: 365 MW
Generation fired by imported mineral coal in Maranhão and Ceará states
Expansion of the integrated model to a new region still highly dependent of oil
Pioneer in implementing a micro-LNG system in Brazil
Azulão-Jaguatirica Integrated Project
Gas E&P in Amazonas + generation at
Roraima's isolated system
- Azulão Field: 6.3 bcm of certified 2P reserves2, with 3.6 bcm tied to the project
- Blocks in the surroundings of Azulão: 5.84 bcm of certified gas contingent resources (P50)²
- Jaguatirica II TPP with 141 MW of installed capacity
Footprint in different Brazilian sedimentary basins, opening new possibilities of access to gas
23 exploratory blocks + the Juruá area, in different exploratory stages
RR
AM
GO
MS
Note: 1- Considers Gavião Belo Field; 2- Gaffney Cline & Associates: Reserves and resources certification reports as of 12/31/2020 (Parnaíba Basin reserves) and 06/30/2021 (Amazonas Basin reserves), excluding the accumulated consumption of | 5 |
the Parnaíba Complex until 3Q21. |
This is an excerpt of the original content. To continue reading it, access the original document here.
Attachments
- Original Link
- Original Document
- Permalink
Disclaimer
Eneva SA published this content on 30 November 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 30 November 2021 21:50:08 UTC.