Gibb River Diamonds Limited announced that the Phase 8 drill program at the Edjudina Gold Project, WA (GIB 100%) has commenced. This Aircore drill program will test areas around the Neta and Gawler Prospects. Targets under transported cover which may be strongly mineralised, but which do not outcrop, will also be drilled.

These targets were generated from GIB reconnaissance mapping work which was conducted over the northern part of the Edjudina line of workings in the month of June.