(via TheNewswire)

Granada Gold Mine Inc.

 


  

May 10, 2022TheNewswire -Rouyn Noranda, Quebec,Granada Gold Mine Inc. (TSXV:GGM) (the “Company” or “Granada”)is pleased to provide a gold assay of 4.33 grams per tonne on its 500-tonne bulk sample taken from surface in 2020.

 

HIGHLIGHTS:

  • A 500-tonne mineralized, and 900-tonne waste rock bulk sample were taken from surface in 2020 

 
  • A 10.5-tonne composite sample was screened from the 500-tonne mineralized bulk sample 

 
  • The 10.5-tonne composite sample was crushed, ground and screened at 20 mesh to ensure no visible gold was in the sample to be evaluated. 

  

Frank J. Basa, P.Eng., President and CEO notes, “The bulk sample confirms both near-surface drill results and the potential for a higher-grade open pit mining scenario. Higher grades translate to lower processing costs per ounce and lower capital expenditures for a processing plant. The bulk sample has returned a higher gold grade than the current target open pit grade of 2 g/t.”  

 

The 500-tonne bulk sample was taken 400 meters east of Pit #1 on the Vein 1 structure which trends 5.2 kilometers east-west. Historically Vein 1 was mined from underground in the thirties at 9-10 grams per tonne gold, and mined by open pit in 1993-94 at 5.17 grams per tonne gold having mined 87,000 tonnes and again in 1996 at 3.46 grams per tonne gold having mined 22,095 tonnes.

 

BULK SAMPLE ASSAY RESULTS

 

The screened, minus 20 mesh material was passed through the sampling tower at Temiskaming Testing Laboratory (TTL) in Cobalt, Ontario.  Five super sacs were sampled by taking four samples from each super sac for assaying.  Duplicate assays were run on one sample per super sac. The table below identifies the sample assay results.  No visible gold was recovered when processing the minus 20 mesh portion of the bulk sample. Visible gold was present in the plus 20 mesh material. At this stage of evaluating the surface mineralization sample, the company is assessing the grade of the material without any high-grade visible gold. It has been estimated, based on metallurgical testing, that close to 50 percent of the gold at Granada is in native form (43-101 Technical Report Updated Mineral Resource Estimate, March 15, 2021).

  

Table 1. Bulk Sample Assay Results for minus 20 mesh fraction

 

Sample ID

Sample Source

 Au by AA (g/t)

OSLSR007-1

Bag #006-1

5.176

OSLSR007-1DUP

4.795

OSLSR007-2

3.949

OSLSR007-3

4.562

OSLSR007-4

2.558

OSLSR007-5

Bag #006A-1

10.197

OSLSR007-5DUP

9.052

OSLSR007-6

13.003

OSLSR007-7

9.693

OSLSR007-8

3.621

OSLSR007-9

Bag #007-1

4.199

OSLSR007-10

2.858

OSLSR007-11

3.249

OSLSR007-12

2.294

OSLSR007-13

Bag #008-1

3.210

OSLSR007-13DUP

3.063

OSLSR007-14

2.850

OSLSR007-15

2.661

OSLSR007-16

3.397

OSLSR007-17

Bag #009-1

1.246

OSLSR007-18

1.352

OSLSR007-19

1.341

OSLSR007-20

1.237

   

BULK SAMPLE LOCATION

 


Click Image To View Full Size

 

Qualified person

 

The technical information in this news release has been reviewed by Frank J. Basa, P.Eng., member of Ontario Order of Engineers and a qualified person in accordance with National Instrument 43-101 standards.

 

Quality Control and Reporting Protocols

 

The subsamples and duplicates were processed at TTL.  The sample weights were 1 Kg.  Each sample was split, and 500 grams were pulverized to -200 mesh, a 30-gram split was used in the fire assay process with AA finish. The process includes blanks and standards which are in line with the expected results which allow public disclosure of the results. Quality Assurance/Quality Control (“QA/QC”) and interpretation of results is performed by qualified persons employing a QA/QC program consistent with NI 43-101 and industry best practices. Standards and blanks are included with every 20 samples for QA/QC purposes for this program in addition to the lab QA/QC.

 

Location

 

The Granada Gold project is located in an established mining district 5 km south of Rouyn-Noranda adjacent to the prolific Cadillac Break shear zone, which is hosted in Pontiac metasedimentary rocks, granites, and younger syenite sills along the Granada shear zone (LONG Bars Zone). The project is located on the same side of the Cadillac Fault as the Canadian Malartic mine property, which has historically produced 12.7 million ounces of gold from 1935 to 2010 with an additional 5 million ounces as of June 18, 2020 (Canadian Malartic Technical Report of March 25, 2021 & Le Citoyen June 19, 2020).

 

About Granada Gold Mine Inc.

 

Granada Gold Mine Inc. continues to develop and explore its 100% owned Granada Gold Property near Rouyn-Noranda, Quebec, and isadjacent to the prolific Cadillac Break.The Company owns 14.73 square kilometers of land in a combination of mining leases and claims. The company is currently undergoing a large drill program with 30,000m out of 120,000m complete. The drills are currently paused to provide the technical team with the necessary time to evaluate and assimilate existing data.

 

The Granada Shear Zone and the South Shear Zone contain, based on historical detailed mapping as well as from current and historical drilling, up to twenty-two mineralized structures trending east-west over five and a half kilometers. Three of these structures were mined historically from four shafts and three open pits. Historical underground grades were 8 to 10 grams per tonne gold from two shafts down to 236 m and 498 m with open pit grades from 3.5 to 5 grams per tonne gold.

 

The property includes the former Granada Gold underground mine which produced more than 50,000 ounces of gold at 10 grams per tonne gold in the 1930’s from two shafts before a fire destroyed the surface buildings.  In the 1990’s, Granada Resources extracted a bulk sample (Pit #1) of 87,311 tonnes grading 5.17 g/t Au.  They also extracted a bulk sample (Pit # 2) of 22,095 tonnes grading 3.46 g/t Au.  

 

On March 15, 2021, the Company released an updated NI 43-101 resource estimate for the Granada Gold project (Please see January 29, 2021 news release) with a combined total of 713,000 gold ounces of measured, indicated, and inferred. This estimate contains 351,000 gold ounces of combined measured, indicated, and inferred for the open pit and 362,000 gold ounces of combined measured, indicated, and inferred for the underground. Please see Table 2 below for full details. Report reference: Granada Gold Project Mineral Resource Estimate Update, Rouyn-Noranda, Quebec, Canada authored by Yann Camus, P.Eng. and Maxime Dupéré, B.Sc, P.Geo., SGS Canada Inc. with an effective date of December 15, 2020, and signature date of March 15, 2021.

  

Table 2: Mineral Resource Estimate Showing Tonnes, Average Grade, and Gold Ounces

 

Type

Category

Tonnes

Avg Grade Au (g/t)

Gold Ounces

Open Pit

Measured

3,756,000

1.89

228,000

Indicated

1,357,000

2.55

111,000

Measured + Indicated

5,113,000

2.06

339,000

Inferred

34,000

11.29

12,000

Underground

Measured

37,000

4.22

5,000

Indicated

807,000

4.02

104,000

Measured + Indicated

844,000

4.03

109,000

Inferred

1,244,000

6.33

253,000

 

The Granada Shear Zone and the South Shear Zone contain, based on historical detailed mapping as well as from current and historical drilling, up to twenty-two mineralized structures trending east-west over five and half kilometers. Three of these structures were mined historically from two shafts and two open pits. Historical underground grades were 8 to 10 grams per tonne gold from two shafts down to 236 m and 498 m with open pit grades from 5 to 3.5 grams per tonne gold.

 

The Company is in possession of all mining permits required to commence the initial mining phase, known as the “Rolling Start”, which allows the company to mine up to 550 tonnes per day. Additional information is available atwww.granadagoldmine.com.

 

“Frank J. Basa”

Frank J. Basa P. Eng.
President and Chief Executive Officer

For further information, please contact:
Frank J. Basa, P. Eng., President and CEO at 1-819-797-4144 or
Wayne Cheveldayoff, Corporate Communications, at 416-710-2410 or
waynecheveldayoff@gmail.com

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore, involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

 

Copyright (c) 2022 TheNewswire - All rights reserved.

Copyright (c) 2022 TheNewswire - All rights reserved., source Press Releases