Graycliff Exploration Limited released a new batch of assay results from drilling the Phase Three drilling program at its Shakespeare Gold Project located on the Canadian Shield near Sudbury, Ontario. Phase Three focused on expanding on the extent of gold mineralization proximal to the historic Miller Shaft where initial gold mining took place more than 100 years ago. Drill Hole J-36 intersected 6.23 grams per tonne of gold (g/t Au) over 5.00 metres (m), including 14.30 g/t Au over 1.00 m. Results continue to show strong gold mineralization extending from surface to the current limit of drilling at depth.