Deep-South Resources Inc. announced the fourth batch of assay results from its drilling program interrupted in June 2021 at its Haib Copper project in southern Namibia. The program was interrupted when the Ministry of Mines and Energy of Namibia had denied the renewal of the Haib Copper licence EPL 3140. Results from 13 drill holes have been received in full after the renewal denial of the licence, with partial results received for 1 drill hole.

The first 6 drill holes were previously reported. Following the completion of QA/QC the results for the remaining 7 holes are disclosed here. The 7 holes for which assay results are reported here cover some 1,360.92 metres and cover all 4 of the target areas.

All holes were positioned to better delineate the previously identified higher grade portions of the Haib Copper Project and to test the extension of grade between these targets. HM12 ? assay results have been received for only the first 96m of the 341.15m drilled.

Width refers to intersection width; true widths have not been determined. CuEq (copper equivalent) has been used to express the combined value of copper and molybdenum and is provided for illustrative purposes only. No allowances have been made of recovery losses that may occur should mining eventually result.