Kula Gold Limited reported that the reconnaissance drilling has been completed at the main `eye' structure at its 100% owned Westonia Project located 5km from the Edna May Gold Mine. The drilling program consisted of 1 Aircore hole and 26 RC holes for 2,292m of drilling. The drilling at the Westonia Project intersected encouraging rock types consistent with an Archean Greenstone sequence and similar to surrounding greenstones.

There were zones of alteration with potential mineralisation to be determined. 614 composite samples from drill cuttings have been sent for analysis with 97 composite samples already sent. From the most recent drilling, 90 composite samples have been requested for expedited processing.