Nine Mile Metals Ltd. announce a segment of XRF results from Hole WD-24-01, marking a significant milestone in its inaugural Phase 1 drill program on the Wedge VMS Project located within the renowned Bathurst Mining Camp in New Brunswick (?BMC?). The Company has completed its XRF analysis for the first upper VMS portion of the drill hole utilizing an Olympus Vanta 50 Portable XRF equipped with a 50Kv Workstation and Reflex XRF software. The XRF process included calibrating the machine and utilizing two standards in the sample stream (OREAS 502B and CDN-BL-10 Blank) at the beginning and end of the analytical sequence.

Except for one sample, each sample consisted of a 1-meter section of cut drill core, and as such, the sample was not homogeneous. There were six Sample Batches over 6.18 meters of mineralization. Each sample batch had approximately 12 -21 data points analyzed per meter.

The core sample is placed cut face down, and the XRF gun takes a random unknown sample of the core.