Niobay Metals Inc. reported an update on the ongoing metallurgical test program performed at SGS Lakefield in Ontario for its James Bay Niobium Project, located in Northern Ontario. Batch flotation tests on the gravity concentrate achieved impressive results with a niobium concentrate inside all required specifications, including silica level and a niobium recovery of 80.6 %. Combined niobium recovery for both gravity circuit and flotation reached 78 %, which is in line with historical results. Metallurgical test work is continuing and includes reagents screening and optimization, concentrate gravity and leaching test work. Flotation locked cycle tests and variability test work will follow to optimize niobium recovery, niobium concentrate grade and grade sensitivity. The company expects the program to continue for at least the next three months. The Preliminary Economic Assessment (‘’PEA’’) performed by G Mining Services Inc. is progressing very well, and the Company is confident to release its results as originally planned, early in the fourth quarter of 2020. The result of the metallurgical tests performed above will be incorporated in the PEA.