Northern Superior Resources Inc. announced a Mineral Resource Estimate (MRE) prepared in accordance with the National Instrument 43-101, Standard for Disclosure for Mineral Projects (NI 43-101) for the Philibert gold property, located 60 kilometres southwest of Chibougamau, Québec, Canada (the Philibert Project; Northern Superior: 75%, SOQUEM: 25%). Highlights Include: 48.46 million tonnes of Inferred Mineral Resource averaging 1.10 grams of gold per tonne for 1,708,809 ounces of gold; 7.88 million tonnes of Indicated Mineral Resource averaging 1.10 grams of gold per tonne for 278,921 ounces of gold; Mineral resource estimated at a cut-off grade of 0.35 g/t gold; Metallurgical testing with flotation concentrate returns recoveries up to 95.6% and 93% used for the pit optimization; While the previous mineral resource estimate on the Philibert Project focused exclusively on underground resources from the western domains, with 239,202 ounces at 5.68 g/t gold,1 the MRE announced does not include any of the underground potential. Such potential will be further explored, evaluated and potentially included in a subsequent mineral resource estimate; Further expansion is anticipated with: i) certain zones along strike and down dip proven mineralized while requiring further drilling to qualify as resource, and ii) the potential for parallel zones to replicate the Philibert mineralization to the North; and Work conducted to date on the Philibert Project based on 3 km of mineralization while geophysics is indicative of an additional 4 km of mineralization spreading East and West.