MONTREAL - Osisko Development Corp. (NYSE: ODV, TSXV: ODV) ('Osisko Development' or the 'Company') announces an updated mineral resource estimate ('MRE') for its 100%-owned underground Trixie deposit (the '2024 Trixie MRE'), within the Company's wider Tintic Project ('Tintic' or the 'Tintic Project'), located in the historic East Tintic Mining District in central Utah, U.S.A.

The 2024 Trixie MRE incorporated an additional 1,674 underground chip samples over 1,678 meters ('m') (5,507 feet ('ft')) of underground development, and 7,385 m of drilling (24,229 ft) in 122 holes completed by the Company since the release of the initial Trixie MRE (the '2023 Trixie MRE'), with an effective date of January 10, 2023.

Relative to the 2023 Trixie MRE, contained gold ounces in measured and indicated resources decreased by 29% and inferred resources decreased by 79% primarily due to lower estimated grades that incorporated an updated geologic model interpretation and conversion of inferred resources. Drill results and underground mapping from the 2023 exploration program improved the knowledge of the extent and distribution of mineralization, resulting in modeling improvements to both mineralization and the historical mine shape model.

Chris Lodder, President, stated, 'The 2024 Trixie MRE incorporates changes to our interpretation of the main mineralized structures and reflects better understanding of the structural controls of the deposit and realistic mining parameters following our exploration and test mining work in 2023. To date exploration and mining occurred on less than 10% of known mineralized structures in the west Tintic district and thus, we see significant precious metal potential at depth, on parallel structures to Trixie, along the Trixie and Sioux Ajax faults to the north and south, as well as around all historic high-grade gold mines in the West Tintic District. These high-grade gold targets, combined with the copper-gold porphyry potential where drilling is underway, and a large area of polymetallic carbonate replacement potential, illustrate that we have only scratched the surface in understanding the overall metal endowment potential of the Tintic district.'

TRIXIE MINERAL RESOURCE ESTIMATE

The 2024 Trixie MRE comprises six mineralized zones within the greater Trixie deposit, including T2, T3, T4, Wild Cat, 40 Fault and 75-85 over a strike length of 530 m, a maximum width of 105 m and to a maximum depth of 195 m for the deposit and is 350 m from surface. These dimensions are for the overall size of the mineralized zone structures, with the 2024 Trixie MRE blocks contained within a smaller 440 m strike length, 60 m total width and 195 m depth footprint.

Gold mineralization is associated with high sulphidation epithermal mineralization, structurally controlled and hosted within the quartzites. Mineralization consists of native Au, and rare Au-Ag rich telluride minerals with quartz and quartz-barite-sulphosalt stockwork veining.

The T2 Zone is the highest-grade structure within the overall deposit. In 2023, a total of 4,637 oz were recovered from processing mineralized material with an overall feed grade of 35.61 g/t Au. The 2023 drill program also converted ounces from inferred to indicated, and drilling at depth indicated a transition from high-grade gold to anomalous copper, which prompted the testing of the deep porphyry target at Trixie West.

The T4 Zone envelops the T2, 40 fault, and Wild Cat domains. Within the T4 domain, there are discrete sub-vertical high-grade gold structures, defined on multiple levels and sections. However, these structures appear to be more discontinuous and less disseminated in the broader area than had been previously estimated. In 2023, mapping and modeling modified the interpretation from a stockwork to distinct high-grade structures. As a result, the model now incorporates tight search parameters around these structures, increasing confidence within the zone, while also including the quartz-barite-sulphosalt disseminated stockwork mineralization.

A mineralized fault structure known as the 40 fault, is mapped over 230 m strike length and 80 m at depth and is about 1 m wide. This fault is a mineralized domain within the T4 and offsets vertically dipping epithermal Au-Ag structures.

The Wildcat domain, a discrete structure within the T4, is steeply dipping to the east and strikes for 237 m and terminates at the 40 fault.

The T1 Zone, previously described in the 2023 Trixie MRE, has been incorporated into the T4 Zone. The T1 Zone was previously an envelope on the contacts of both the 75-85 and T2 Zones. The T1 Zone had similar high-grade fissure zones as described in the T4 Zone, that are constrained within the T4 envelope. Additional drilling in this area also reduced the estimated contained gold above cut-off.

The 75-85 Zone is a moderately west dipping silica sulphide cemented breccia zone. Drilling along strike to the south suggests that the 75-85 Zone truncates both the T2 structure and T4 zone. Mine development in 2023 intersected previously unknown stopes within the modelled 75-85 Zone and high-grade assays were less continuous at depth, although increasing down plunge.

ABOUT OSISKO DEVELOPMENT CORP.

Osisko Development Corp. is a North American gold development company focused on past-producing mining camps located in mining friendly jurisdictions with district scale potential. The Company's objective is to become an intermediate gold producer by advancing its 100%-owned Cariboo Gold Project, located in central B.C., Canada, the Tintic Project in the historic East Tintic mining district in Utah, U.S.A., and the San Antonio Gold Project in Sonora, Mexico. In addition to considerable brownfield exploration potential of these properties, that benefit from significant historical mining data, existing infrastructure and access to skilled labour, the Company's project pipeline is complemented by other prospective exploration properties. The Company's strategy is to develop attractive, long-life, socially and environmentally sustainable mining assets, while minimizing exposure to development risk and growing mineral resources.

Contact:

Sean Roosen

Tel: +1 (514) 940-0685

Email: sroosen@osiskodev.com

CAUTIONARY STATEMENTS

Cautionary Statement Regarding Test Mining Without Feasibility Study

The Company cautions that its prior decision to commence small-scale underground mining activities and batch vat leaching at the Trixie test mine was made without the benefit of a feasibility study, or reported mineral resources or mineral reserves, demonstrating economic and technical viability, and, as a result there may be increased uncertainty of achieving any particular level of recovery of material or the cost of such recovery. The Company cautions that historically, such projects have a much higher risk of economic and technical failure. Small scale test-mining at Trixie was suspended in December 2022 and resumed in the second quarter of 2023. Even with the resumption of small-scale test-mining at Trixie, there is no guarantee that production will continue as anticipated or at all or that anticipated production costs will be achieved. The failure to continue production may have a material adverse impact on the Company's ability to generate revenue and cash flow to fund operations. Failure to achieve the anticipated production costs may have a material adverse impact on the Company's cash flow and potential profitability. In continuing current operations at Trixie, the Company has not based its decision to continue such operations on a feasibility study, or reported mineral resources or mineral reserves demonstrating economic and technical viability.

Cautionary Statement to U.S. Investors

The Company is subject to the reporting requirements of the applicable Canadian securities laws and, as a result, reports information regarding mineral properties, mineralization and estimates of mineral reserves and mineral resources, including the information in its technical reports, financial statements, MD&A and this news release, in accordance with Canadian reporting requirements, which are governed by NI 43-101. As such, such information concerning mineral properties, mineralization and estimates of mineral reserves and mineral resources, including the information in its technical reports, financial statements, MD&A and this news release, is not comparable to similar information made public by U.S. companies subject to the reporting and disclosure requirements of the U.S. Securities and Exchange Commission ('SEC').

CAUTION REGARDING FORWARD LOOKING STATEMENTS

Certain statements contained in this news release may be deemed 'forward-looking statements' within the meaning of the United States Private Securities Litigation Reform Act of 1995 and 'forward-looking information' within the meaning of applicable Canadian securities legislation (together, 'forward-looking statements'). These forward-looking statements, by their nature, require Osisko Development to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from those expressed or implied in these forward-looking statements. Forward-looking statements are not guarantees of performance. Words such as 'may', 'will', 'would', 'could', 'expect', 'believe', 'plan', 'anticipate', 'intend', 'estimate', 'continue', or the negative or comparable terminology, as well as terms usually used in the future and the conditional, are intended to identify forward-looking statements. Information contained in forward-looking statements is based upon certain material assumptions that were applied in drawing a conclusion or making a forecast or projection, including the assumptions, qualifications and limitations relating to the significance of the high-priority target drilling; the utility of modern exploration techniques; the potential for parallel high-grade gold fissure zones; the potential of Tintic to host a copper-gold porphyry center; the significance of regional exploration potential; the results of the 2024 Trixie MRE; the capital resources available to Osisko Development; the ability of the Company to execute its planned activities; the ability of the Company to obtain future financing and the terms of such financing; management's perceptions of historical trends, current conditions and expected future developments; the Company's ability to prepare and file the Technical Report within 45 days; the utility and significance of historic data, including the significance of the district hosting past producing mines; future mining activities; unique mineralization at Trixie; the potential of high-grade gold mineralization on Trixie; the potential for unknown mineralized structures to extend existing zones of mineralization; category conversion; the timing and status of permitting; the results (if any) of further exploration work to define and expand mineral resources; the ability of exploration work (including drilling and chip sample assays, and face sampling methodologies) to accurately predict mineralization; the ability to generate additional drill targets; the ability of management to understand the geology and potential of the Company's properties; the ability of the Company to expand mineral resources beyond current mineral resource estimates; the ability of the Company to complete its exploration objectives for its projects in 2024 in the timing contemplated (if at all); the ongoing advancement of the deposits on the Company's properties; the deposit remaining open for expansion at depth and down plunge; the ability to realize upon any mineralization in a manner that is economic; the ability to adapt to changes in gold prices, estimates of costs, estimates of planned exploration and development expenditures; the ability of the Company to obtain further capital on reasonable terms; assay results presented in this news release; the profitability (if at all) of the Company's operations; the Company being a well-positioned gold development company in Canada, USA and Mexico; sustainability and environmental impacts of operations at the Company's properties; as well as other considerations that are believed to be appropriate in the circumstances, and any other information herein that is not a historical fact may be 'forward looking information'. Material assumptions also include, management's perceptions of historical trends, the ability of exploration (including drilling and chip sample assays, and face sampling) to accurately predict mineralization, budget constraints and access to capital on terms acceptable to the Company, current conditions and expected future developments, regulatory framework remaining defined and understood, results of further exploration work to define or expand any mineral resources, as well as other considerations that are believed to be appropriate in the circumstances. Osisko Development considers its assumptions to be reasonable based on information currently available, but cautions the reader that their assumptions regarding future events, many of which are beyond the control of Osisko Development, may ultimately prove to be incorrect since they are subject to risks and uncertainties that affect Osisko Development and its business. Such risks and uncertainties include, among others, risks relating to capital market conditions and the Company's ability to access capital on terms acceptable to the Company for the contemplated exploration and development at the Company's properties; the ability to continue current operations and exploration; regulatory framework and presence of laws and regulations that may impose restrictions on mining; the ability of exploration activities (including drill and chip sampling, and face sampling results) to accurately predict mineralization; errors in management's geological modelling; the ability to expand operations or complete further exploration activities, including drilling and chip sample assays and face sampling; the timing and ability of the Company to obtain required approvals and permits; the results of exploration activities; risks relating to exploration, development and mining activities; the global economic climate; metal and commodity prices; fluctuations in the currency markets; dilution; environmental risks and community, non-governmental and governmental actions and the impact of stakeholder actions. Readers are urged to consult the disclosure provided under the heading 'Risk Factors' in the Company's annual information form for the year ended December 31, 2022 as well as the financial statements and MD&A for the year ended December 31, 2022, which have been filed on SEDAR+ (www.sedarplus.ca) under Osisko Development's issuer profile and on the SEC's EDGAR website (www.sec.gov), for further information regarding the risks and other factors applicable to the exploration results. Although the Company's believes the expectations conveyed by the forward-looking statements are reasonable based on information available as of the date hereof, no assurances can be given as to future results, levels of activity and achievements. The Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by law. Forward-looking statements are not guarantees of performance and there can be no assurance that these forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.

(C) 2024 Electronic News Publishing, source ENP Newswire