Nordic Gold Inc. announced that further to its Letter to Shareholders detailing the Company's path forward ­ management and Coffey, a Tetra Tech Company (`Tetra Tech') have finalized the Company's proposed drill program at its Laiva Project in Finland designed to (i) infill drill targets for the third pit within 200 m of the existing pit, (ii) infill drill the lode extensions and (iii) infill drill the two pits currently open. The program will include a total of 146 holes drilling between 10,000 metres and 15,000 metres, depending on the depth of the zones of mineralization. The drilling within the pits will close the spacing from 50 m to 25 m, the identified density to upgrade the resources. The angled drilling within the pits will also provide invaluable understanding of the contact of the zones for detailed mine planning. The infill drill program is planned at a 100 m depth. Drilling is planned with azimuth of 360o (North) and dip of 50o. Holes can be cut short or extended, depending on intercepts and mineralization, based on decisions by the geologist. The holes will not be ended whilst in mineralization. The holes have been planned in the South, North and East pit areas as detailed in the Laiva Drill Plan 2019 and lodged on SEDAR.