For personal use only

OZ Minerals Limited

PROMINENT HILL

Mineral Resource and Ore Reserve Statement and Explanatory Notes

As at 30 June 2021

Prominent Hill Mineral Resource and Ore Reserve Statement and Explanatory Notes As at 30 June 2021

For personal use only

SUMMARY

The June 2021 Prominent Hill Mineral Resource and Ore Reserve estimates are presented in Tables 1 and 2. The Mineral Resource is inclusive of the Ore Reserve. Numbers in the tables have been rounded.

Table 1: Mineral Resource Estimate as at 30 June 2021

Prominent Hill

Category

Tonnes

CuEq

Cu

Au

Ag

Cu

Au

Ag

(Mt)

(%)1

(%)

(g/t)

(g/t)

(kt)

(koz)

(Moz)

Underground

Measured

42

1.6

1.3

0.6

3.2

520

830

4.3

$49/t NSR2 cut-off

Indicated

44

1.5

0.9

0.9

2.7

420

1,200

3.9

envelope3

Inferred

51

1.4

0.8

0.9

2.3

430

1,500

3.7

Sub-Total

140

1.5

1.0

0.8

2.7

1,400

3,600

12

Surface Stocks - Copper4

Measured

2.4

0.8

0.6

0.4

1.7

14

28

0.1

Surface Stocks - Gold4

Indicated

9.5

0.5

0.1

0.6

0.4

10

190

0.1

Surface Stocks - Marginal4

Indicated

2.7

0.4

0.2

0.3

0.5

4.3

30

0.05

Surface Stocks4

Sub-Total

15

0.5

0.2

0.5

0.6

28

250

0.3

Total

Measured

44

1.6

1.2

0.6

3.1

540

860

4.4

Indicated

56

1.3

0.8

0.8

2.2

430

1,500

4.1

Inferred

51

1.4

0.8

0.9

2.3

430

1,500

3.7

Total

150

1.4

0.9

0.8

2.5

1,400

3,800

12

Table 2: Ore Reserve Estimate as at 30 June 2021

Prominent Hill

Category

Tonnes

CuEq

Cu

Au

Ag

Cu

Au

Ag

(Mt)

(%)1

(%)

(g/t)

(g/t)

(kt)

(koz)

(Moz)

Underground

Proved

25

1.7

1.3

0.6

3.2

320

490

2.6

Probable

24

1.5

1.0

0.7

2.8

240

570

2.1

Sub-Total

48

1.6

1.2

0.7

3.0

560

1,100

4.7

Surface Stocks - Copper4

Proved

2.4

0.8

0.6

0.4

1.7

14

28

0.1

Surface Stocks - Gold4

Probable

9.5

0.5

0.1

0.6

0.4

10

190

0.1

Surface Stocks - Marginal4

Probable

2.2

0.4

0.2

0.3

0.6

3.6

24

0.04

Surface Stocks4

Sub-Total

14

0.5

0.2

0.5

0.7

28

240

0.3

Total

Proved

27

1.6

1.2

0.6

3.1

330

510

2.7

Probable

35

1.1

0.7

0.7

2.0

250

780

2.3

Total

62

1.3

0.9

0.6

2.5

590

1,300

5.0

For the three months ending 30 June 2021, approximately 2.2 million tonnes of copper and gold ore was processed, 1.2 million tonnes from surface stockpiles and 1.0 million tonnes from the Prominent Hill Underground.

  1. Copper equivalent (CuEq %) calculation can be found under "Cut-off parameters" in the attached JORC Table 1 documentation
  2. Net smelter return (NSR) details can be found under Section 4 "Cut-off parameters" in the attached JORC Table 1
  3. Envelope produced by stope optimisation using 5m minimum width, 12m height, 20m length
  4. Stockpile cut-off is $17/t NSR which covers rehandle and processing costs

Page 2 of 28

Prominent Hill Mineral Resource and Ore Reserve Statement and Explanatory Notes As at 30 June 2021

For personal use only

SETTING

Prominent Hill is an iron oxide copper gold (IOCG) deposit located in the Gawler Craton, South Australia (Figure 1). The Gawler Craton covers approximately 600,000 square kilometres of South Australia. The Gawler Craton hosts Olympic Dam, Prominent Hill, Carrapateena, and a number of other smaller and sub- economic copper-gold deposits. Most of these deposits are thought to be genetically related to the Gawler Range Volcanic (GRV) - Hiltaba magmatic event which affected the central and eastern portions of the Gawler Craton around 1600-1580 million years ago. Copper-gold-silver mineralisation at Prominent Hill is mostly hosted within hematite-matrix breccia. Copper mineralisation occurs as disseminations of chalcocite, bornite and chalcopyrite in the matrix of the breccia.

Figure 1: Location of Prominent Hill, South Australia

Page 3 of 28

Prominent Hill Mineral Resource and Ore Reserve Statement and Explanatory Notes As at 30 June 2021

For personal use only

MINERAL RESOURCE

The Prominent Hill Mineral Resource as at 30 June 2021 has been estimated at 150 million tonnes grading 0.9 per cent copper and 0.8 grams per tonne gold (Table 1). This estimate includes mineralisation from both the Prominent Hill Underground and surface stockpiles. The Mineral Resource is inclusive of the Ore Reserve.

The updated Prominent Hill Mineral Resource estimate includes, where applicable, additional delineation and grade control drilling completed since the cut-off date of the previous Mineral Resource release, reflects geological interpretation adjustments and improved classification confidence, and mining depletion.

Changes in the Mineral Resource Estimate

Differences between the June 2021 and March 2021 Prominent Hill Mineral Resource estimates are summarised in Figure 2, Figure 3 and Figure 4. Differences include:

  1. Data from 30 new drill holes have been added since the last estimate. Most of these new drill holes are located in zones of previously Inferred Mineral Resources. Consequently, a small proportion of the previously Inferred Mineral Resource has been reclassified as Indicated. Some changes have also been made to the geological interpretation within the remaining Inferred zone. Geological interpretation has not changed significantly in the Measured zone.
  1. Decreases due to the depletion of existing surface stockpiles and ongoing mining of the underground Mineral Resource.

Page 4 of 28

Prominent Hill Mineral Resource and Ore Reserve Statement and Explanatory Notes As at 30 June 2021

personal use only

Figure 2: Tonnage change in 30 June 2021 Prominent Hill Mineral Resource estimate*

June 2021 Mineral Resource Change

160

Tonnage (Mt)

150

2.9

150

150

-1.3

-0.9

Tonnes (Mt)

140

Mineralisation

130

120

110

100

March 2021 Mineral Resource

Mining depletion

Stockpile change

Drilling and modelling changes

June 2021 Mineral Resource

*Totals subject to rounding to two significant figures. Data includes Measured, Indicated and Inferred Mineral Resources.

Figure 3: Copper metal change in 30 June 2021 Prominent Hill Mineral Resource estimate*

June 2021 Mineral Resource Change

1,450

Copper Metal (kt)

For

1,400

1,400

14

1,400

0.3

-21

Copper Metal (kt)

1,350

1,300

1,250

1,200

March 2021 Mineral Resource

Mining depletion

Stockpile change

Drilling and modelling changes

June 2021 Mineral Resource

*Totals subject to rounding to two significant figures. Data includes Measured, Indicated and Inferred Mineral Resources.

Page 5 of 28

This is an excerpt of the original content. To continue reading it, access the original document here.