Pan American Energy Corp. announce the commencement of comprehensive metallurgical testing at University of Nevada, Reno. The Company delivered 46 individual lithium-bearing core samples from twelve separate drill holes at the Horizon Lithium Project, located in the Big Smoky Valley, Esmeralda County, Nevada.

The twelve represented drill holes were part of the Phase 1 and Phase 2 drilling campaigns completed by Pan American at Horizon in 2023. Utilizing the results of the Phase 1 and Phase 2 drilling, Pan American declared an indicated mineral resource of 1.325 million tonnes lithium carbonate equivalent and an inferred mineral resource of 8.879 million tonnes LCE. The average grade of the indicated mineral resources was 669 ppm lithium (over a total tonnage of 372,845,000 tonnes) and the average grade of the inferred mineral resources was 680 ppm lithium (over a total tonnage of 2,453,963,000 tonnes).

To provide a sample set that is representative of the deposit, the 46 submitted samples each carry an assayed lithium grade within 50 +/- of 669 ppm and each exhibit lithological traits that are characteristics of the host lithology. The metallurgical testing and mineral processing procedure is divided into distinct phases. Phase 1 is currently underway: Phase 1: Sample Receipt and Preparation: Physical Properties Assessment ?

including conducting particle size analysis, determining sample density and undertaking meticulous sample preparation protocols. Phase 2: Head Analyses ? including analyzing samples for lithium, boron, magnesium, calcium, sodium and a series of individual elements through the ICP method.

Phase 3: Leach Extraction Testing ? including sulfuric acid leach shake tests to determine the preliminary leaching characteristics of the sample at ambient temperature. Phase 4: Lithium Recovery From Solution ?

using experimental methods to remove impurities and increase lithium concentrations with the aim of producing lithium carbonate. Phase 5: Exploring Potential By-Products ? investigating the possibility of extracting other elements if present in notable qualities.

Phase 6:Proposed Flowsheet Development ? proposing an initial flowsheet outlining material flow rates across different sections of this process, which is expected to undergo modifications based on ongoing testing and optimization.