In this report newly received lithium assay intersections for drillholes RKDD073-RKDD091 (excluding RKDD087 and 088) are presented and discussed from south to north. Relevant plans and cross sections are also shown. New results RKDD073-091: On Section Z1, RKDD090 and 091 were drilled as extensional holes and represent the most southern holes now drilled along the trend. Both holes intersected lithium mineralisation over appreciable widths. In hole RKDD090, from 6.5m to 60.95m an aggregate mineralised width of 32.7m @ 0.49% Li2O was intersected. This included a continuous intersection of 24.6m @ 0.48% Li2O from 10.65m. In hole RKDD091 from 12.0m to 113.15m an aggregate mineralised width of 58.5m @ 0.52% Li2O was intersected. This includes a continuous zone of 11.50m @ 0.75% Li2O from 52m, as well as other wide but lower grade zones. On Section A, RKDD089 was drilled originally as an extensional hole to test down-dip of RKDD009. Results for RKDD089 from 136.45m to 170.4m returned an aggregate mineralised width of 36.3m @ 0.59% Li2O. This includes continuous intersections of 12.6m @ 0.62% Li2O from 129.3m and 8.5m @ 0.73% Li2O from 146m. Additional narrower lepidolite pegmatites were intersected above and below these zones. Additional drilling has been undertaken on this section with RKDD094 drilled as an infill hole and intersected 31.8m of aggregate lepidolite pegmatite width from 64.4m to 147.4m. RKDD096 was drilled as an extensional hole and intersected lepidolite rich pegmatite over 11m width from 179.3m as well as many other narrower zones. Assay results for both holes are awaited. On Section C, RKDD085 was drilled as an extensional hole to test down-dip of RKDD015. From 203.5m RKDD085 returned an intersection of 13.5m @ 0.69% Li2O. This represents one of the deepest lithium intersections at the project to date. Further down the hole a pegmatite zone returned an intersection of 31.5m @ 0.12% Sn from 295.65n. RKDD085 is a vertical hole, as such estimated true width is around 66% of the reported downhole width. RKDD086 was drilled as an infill hole up-dip from RKDD085. From 110m to 210.55m RKDD085 intersected an aggregate mineralised zone of 32.35m @ 0.49% Li2O. This includes a continuous zone of 15m @ 0.64% Li2O from 169m. Further down the hole a pegmatite zone returned an intersection of 15.2m @ 0.18% Sn and 0.13% Li2O from 235.6m. RKDD093 was drilled to target down-dip extensions of the zones intersected in hole RKDD086 and intersected several pegmatites including a 6.6m wide pegmatite from 505.95m. Assay results for this hole are awaited. On Section L, RKDD074 was drilled from the west side of the pit to target up-dip extensions from RKDD049. The main pegmatite occurred over 21.8m from 96.6m and whilst containing only anomalous lithium, this zone averaged 0.10% Sn and 130ppm Ta2O5. RKDD074 intersected some narrow pegmatites with low grade lithium around 65m and 70m. RKDD078 was drilled as an extensional hole down-dip from RKDD049, with two narrow zones of lithium mineralisation were intersected, being 1.7m @ 0.69% Li2O from 27.7m and 1.65m @ 0.58% Li2O from 185.2m. Other pegmatite related mineralisation occurred
in two zones, being 14.60m 0.12% Sn and 122ppm Ta2O5 from 210.4m and the second 6.7m @ 0.15% Sn and 104 ppm Ta2O5 from 247m. Both these zones contained <0.1% Li2O. On Section M, RKDD076 was an up-dip infill hole. From 38.9m the hole intersected a 17.1m zone of mineralisation averaging 0.15% Li2O. 0.08% Sn and 186ppm Ta2O5. This included a 3m zone @ 0.79% Li2O from 53m. On Section N, RKDD075 was drilled to test downdip extensions from RKDD040. RKDD075 returned an intersection of 30.45m @ 0.15% Li2O, 0.15% Sn and 106ppm Ta2O5 from 193.15m. This zone included several narrower zones with an aggregate width of 14m @ 0.24% Li2O. On Section O, RKDD077 was drilled as an infill hole. From 15.5m to 115.75m the hole returned an aggregate intersection of 28.1m @ 0.45% Li2O, this included a continuous zone of 15.75m @ 0.55% Li2O from 100m and 9.25m @ 0.24 Li2O from 86.95m. Further up the hole are several 1-5m wide zones averaging 0.24% Li2O. RKDD079 was drilled as an infill hole between Section P and Q. The hole yielded several lithium rich intersections, including 20.9m @ 0.37% Li2O from 91.2m and 3.7m @ 0.46% Li2O from 124.2m, along with several other narrower zones up and downhole. On Section Q, RKDD073 was drilled looking for potential extensions beneath RK Main pit. The hole intersected several narrow zones of pegmatite from 70.8m to 73.8m and 182.5m -189.9m. Both these zones averaged around 0.3% Li2O. On Section R, RKDD080 was drilled looking for up-dip extensions up-dip of RKDD031. From 43.5m to 94.6m RKDD080 returned an aggregate intersection of 29.15m @ 0.43% Li2O, including a continuous zone of 14.6m @ 0.43% from 69.3m, along with other intersections in the hole. On Section S, RKDD081 was drilled as a deep extensional hole at the northern limit of the old open pit. The hole intersected several zones of pegmatite from 5.5-7m wide. The best lithium intersection was 5.45m @ 0.17% Li2O from 196.4m. Other zones of low-grade tin and tantalum are reported. On Section T, a `tail' or extension to RKDD032 was drilled from 120m-190.2m.