Southern Power Generation Sdn Bhd has awarded Pöyry with an owner's engineer services assignment for a 1,440 MW combined cycle power plant in Johor, Malaysia. The project consists of two 720 MW natural gas-fired combined cycle blocks, with distillate as backup fuel. Each block consists of GE 9HA.02 gas turbine, triple pressure reheat once-through type heat recovery steam generator and steam turbine in single shaft configuration. The project also includes new 275/132kV air insulated substation and new 132kV gas insulated substation. The plant will be located adjacent to the existing Sultan Iskandar Power Station at Pasir Gudang, Johor. Pöyry's assignment includes assistance in project management, design review, site supervision services, quality assurance and quality control, commissioning supervision services and services during warranty period. Pöyry is assisted in the assignment by its local partner, Minconsult Sdn Bhd. The overall schedule for Pöyry's services is about four years. The value of the order is not disclosed. The order has been recognised within the Energy Business Group order stock in second half 2017.