Pretium Resources Inc. provides production guidance for the full year 2021. Gold production at the Brucejack Mine for 2021 is expected to be in the range of 325,000 to 365,000 ounces. The processing rate is expected to average 3,800 tonnes per day with average annual gold grade ranging between 7.5 grams per tonne to 8.5 grams per tonne at a targeted gold recovery of 97%.