Pucara Gold Ltd. announced that it has completed its Phase 1 Lourdes Gold Project drill program, the first ever drill program on the Lourdes Gold Project. All 25 holes have been submitted to the ALS Laboratory in Lima for assays. Pucara Gold has completed its Phase 1 drilling program at the previously undrilled Lourdes Gold Project. Pucara completed a total of 3,955 meters in 25 holes, including 19 reverse circulation (RC) and 6 core holes. Summary: Pucara Gold has completed its Phase 1 drilling program at the previously undrilled Lourdes Gold Project. Pucara completed a total of 3,955 meters in 25 holes, including 19 reverse circulation (RC) and 6 core holes. The Drill Program has confirmed the interpretation of the geophysical IP resistivity anomalies as pervasive silica alteration with an excess of 200 metres of oxidized silica alteration; known to be a favourable host for gold mineralization. CEO, Steve Zuker, and VP Exploration, Ken Balleweg, traveled to the Lourdes Gold Project to oversee the completion of the drill campaign. Drill assay results from Phase 1 are pending and expected in January 2021.