Red Pine Exploration Inc. reported new drilling results from its ongoing exploration program. The new results validate that drilling around the boundaries of the 2019 resource in the Jubilee can extend the high-grade core of the Jubilee Shear Zone and continue to expand the footprints of mineralization in the gold zones overlying the Jubilee Shear (hanging wall). High grade gold in the Jubilee Shear: Confirmation that significant mineralization exists in the Jubilee Shear which are currently excluded from the 2019 resource; 10.92 g/t gold over 28.05 metres at the intersection of the Minto B/Jubilee Shears that includes 209.1 g/t gold over 1.00 metres, 49.9 g/t gold over 1.00 metres and 28.0 g/t gold over 1.00 metres in SD-23-442.

Extension of mineralization in the Minto B Shear above the Jubilee Shear: 6.44 g/t gold over 2.17 metres within a larger mineralization halo containing 2.08 g/t gold over 7.43 metres in SD-23-444; 3.52 g/t gold over 1.61 metre within a larger mineralization halo containing 0.49 g/t gold over 19.91 metres in SD-23-443.