Resolute Mining Limited provided an update on Senegal exploration prospects, including a maiden Inferred Mineral Resource Estimate at the Tomboronkoto ("Tombo") project. Highlights Tomboronkoto: Maiden Inferred Mineral Resource Estimate (MRE) for the Tomboronkoto prospect of 3.4Mt grading 2.2g/t Au for 264 koz at 1g/t cut-off or 10.2Mt grading 1.2 g/t Au for 403 koz at 0.5 g/t cut-off; Tomboronkoto is located 20km by road from the Mako Processing Plant; The MRE is based on shallow drilling completed to date with the majority of the current resource located in the top 100m and remains open along strike to the west and down dip; Preliminary metallurgical test-work on samples from Tomboronkoto show the mineralisation is free milling with recoveries exceeding 90% from fresh and weathered gold mineralised materials; The focus over the remainder of 2024 will be on both infill drilling to convert Inferred resources to the Indicated category and further drilling to expand the resource Bantaco. Resolute has signed a Joint Venture on the Laminia Project which is located east and contiguous with the Bantaco JV area; The Laminia Project covers the southern extensions of the Massawa Shear zone which controls the gold mineralisation hosted in the Massawa Deposits held by Endeavour Mining Corporation.

Drilling Program: Resolute commenced its first Reverse Circulation drilling campaign at Tomboronkoto in mid-2023. A total of 54 holes for 8,900 metres was completed with the program ending in October 2023. This was the first program completed by Resolute on the prospect and was focused on better defining the gold mineralisation zone identified by previous explorers including Randgold Resources.

The drilling program achieved the goals as set out with assay results confirming the target zone with broad intersections of medium to high-grade gold mineralisation in most holes drilled during the program. The results from the leach test work demonstrate that the Tomboronkoto ore body is free milling, with recoveries exceeding 90% of fresh and weathered gold mineralized material. The eastern part of the permit covers the southern extension of the Makosa (Thor Exploration) and Makabingui (Bishop Resources) shears.

Gold in soil results highlighted two long anomalies along the shears which will be tested by auger drilling. Classification criteria Mineral Resources were classified in accordance with the Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC, 2012). All aspects of the sampling, assay procedures and QA/QC program have been reviewed and were judged to be suitable for use in the estimation of Mineral Resources.

Drill hole assay result data has been checked against the original hardcopy laboratory assay reports for a representative number of holes. This spacing is adequate to determine the geological and grade continuity for reporting of an Inferred Mineral Resources. Drill samples were composited to 1m for use in the use in the estimation of Mineral resources.

Drill samples were composited To 1m for use in the mineralisation.