onlyROX

ASX ANNOUNCEMENT

RRL1827D

26 July 2022

Co-funded Diamond Drilling Commences at

RESOURCES LIMITED

the Mt Fisher Gold Project

Highlights:

ASX: RXL

useRox Resources Limited (ASX: RXL) is an Australian listed company with advanced gold a ets in Western Australia: the Yo anmi Gold Project and the Mt Fisher Gold project.

DIRECTORS

Mr Stephen Dennis

Chairman

Mr Alex Passmore

Managing Director

Dr John Mair

Non-Executive Director

Mr Robert Ryan

Non-Executive Director

Shares on Issue

168.9m

Share Price

$0.26

personal

$43.9m

Market Cap.

Cash

$6.9m

(as at 31 March 22)

Level 2, 87 Colin Street,

West Perth WA 6005

For+61 8 9226 0044

admin@roxresources.com.au

www.roxresources.com.au

Follow Rox:

  • Rox has commenced diamond drilling targeting a strong electromagnetic (EM) conductor down plunge of the high- grade historical Mt Fisher Gold Mine
  • Multiple EM conductors over 3km of strike remain untested by drilling
  • Rox awarded up to $67,000 co-funded drilling grant by WA Government
  • Assays pending for 17 holes from 2,200m of RC drilling at the Mt Fisher Gold Project

___________________________________________________________

West Australian gold exploration and development company, Rox Resources Limited ("Rox" or "the Company") (ASX: RXL) is pleased to report that diamond drilling has commenced at the Mt Fisher Gold Project (Rox 100%).

The Mt Fisher Gold Project is an early-stage project within the Company's project pipeline that includes the advanced stage Youanmi Gold Project (3.2 million ounces gold - ASX announcement 20 April, 2022).

The Mt Fisher Gold Project is located in the Northern Goldfields, approximately 500km northeast of Kalgoorlie (about 120km east of Wiluna) within the Mt Fisher greenstone belt. This belt is located 40km east of the prolific Yandal greenstone belt, host of significant gold deposits including Jundee, Bronzewing and Mt McClure.

The co-funded diamond drilling program comprises one deep diamond hole (600m total depth, HQ), designed to test a strong electromagnetic (EM) conductor potentially related to pyrrhotite associated gold mineralisation down plunge of the high-grade historical Mt Fisher Mine.

The Company was successful in its application for a grant of a maximum of $67,000 towards diamond drilling costs at Mt Fisher, under Round 25 of the Western Australian Government Exploration Incentive Scheme ("EIS"). The EIS grant will contribute towards 50% of direct drilling cost.

Rox's tenure covers a large area over the Mt Fisher greenstone belt (850km² in total, comprising: Rox 100% 500km², and Cullen Resources JV 350km²) (Figure 1). Under the Cullen JV Rox is earning up to 75%, with Cullen Resources Limited holding the remaining 25%.

For personal use only

Managing Director Alex Passmore commented:

"We are very pleased to be undertaking deep diamond drilling via the WA Exploration Incentive Scheme (EIS) following up on the ground electromagnetic anomalies delineated previously by Rox that potentially relate to pyrrhotite associated gold mineralisation within the Mt Fisher belt. The conductive anomalies are defined over a substantial strike length and likely represent the down plunge extension of mineralisation at the high-grade historic Mt Fisher Mine.

"The scheme assessment requires proposals to test innovative, soundly based mineral deposit model or petroleum / energy plays with the potential to advance exploration activity in under-explored areas whilst also delivering sound geoscientific information. Based on sound geology and targeting methodology Rox was awarded this co-funding grant in Round 25 of the EIS.

"The Rox 100% owned Mt Fisher gold project is earlier stage than our flagship Youanmi gold project although shows great exploration upside and is an important part of our exploration and development pipeline."

ROX RESOURCES LIMITED

2

ASX CODE: RXL

Level 2, 87 Colin Street,

E: admin@roxresources.com.au

West Perth WA 6005

+61 8 9226 0044

www.roxresources.com.au

For personal use only

Figure 1. Mt Fisher Gold and Mt Eureka project tenements over interpreted bedrock geology and downhole gold

grades.

ROX RESOURCES LIMITED

3

ASX CODE: RXL

Level 2, 87 Colin Street,

E: admin@roxresources.com.au

West Perth WA 6005

+61 8 9226 0044

www.roxresources.com.au

For personal use only

Mt Fisher Mine

The Mt Fisher gold deposit is hosted within a sulphide facies chert (Mt Fisher Chert), bounded by a strongly foliated chloritic ultramafic hanging wall and a basaltic footwall. The sequence strikes north-northeast and dips to the east at approximately 50°. Gold mineralisation occurs in association with massive and disseminated sulphides, mainly pyrrhotite, with lesser pyrite. Mineralisation plunges moderately southwards beneath the southern end of the existing open pit and is open at depth.

A ground electromagnetic (EM) survey by Rox in 2012 defined several conductive anomalies that are potentially related to pyrrhotite associated gold mineralisation within the Mt Fisher Chert. The conductive anomalies are defined over 3km of strike length and appear to represent the down plunge extension of mineralisation at the Mt Fisher Mine. The size of the EM anomaly to the south of the Mt Fisher mine indicates potential for a larger body of mineralisation than defined by previous mining (Figure 2).

Total production from the Mt Fisher open pit was reportedly 218,000 tonnes at 4.3 g/t Au for 30koz. The current gold resource at the Mt Fisher mine is 230kt @ 3.6g/t Au for 26,000oz (RXL ASX Release 11 July 2018).

Drilling was completed by Rox in December 2021 to test the down plunge extension of mineralisation.

Drilling confirmed strong continuity of high-grade mineralisation up to 340m down plunge of the mine with mineralisation open along strike to the south and down dip to the east.

High-grade results include from 2021 drilling include: (ASX: RXL 27 April 2022)

  • MFRC065: 5m @ 6.31g/t Au from 222m within 9m @ 3.77g/t Au from 219m
  • MFDD002: 0.51m @ 4.52g/t Au from 319.45m, including 0.24m @ 8.64g/t Au from 319.45m

Significantly, drilling identified the mineralised sulphide assemblage as semi massive pyrrhotite (up to 30%) and cross cutting quartz veining with pyrrhotite, pyrite and minor arsenopyrite. This confirms that gold mineralisation is associated with the highly conductive sulphide pyrrhotite.

The planned co-funded diamond hole will test the centre of the large EM conductor 2.4km down plunge to the south of the Mt Fisher mine to a total hole depth of 600 metres (Figure 3).

ROX RESOURCES LIMITED

4

ASX CODE: RXL

Level 2, 87 Colin Street,

E: admin@roxresources.com.au

West Perth WA 6005

+61 8 9226 0044

www.roxresources.com.au

For personal use only

Figure 2. Location plan of the Mt Fisher Mine displaying drill hole intersections, modelled EM conductor plates

and planned diamond drilling.

ROX RESOURCES LIMITED

5

ASX CODE: RXL

Level 2, 87 Colin Street,

E: admin@roxresources.com.au

West Perth WA 6005

+61 8 9226 0044

www.roxresources.com.au

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Rox Resources Limited published this content on 25 July 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 25 July 2022 23:28:06 UTC.