Samex Mining Corp. announced steadily advancing the exploration program at its Los Zorros property in Chile. Drilling since mid-December includes over 4,700 meters in 11 holes (two holes are currently in progress) and has variably encountered anomalous and massive sulphide mineralization including; pathfinder minerals, favourable sedimentary intervals and structurally controlled mineralization. Program highlights include: Milagro Project - Drill hole MW-12-01, located on the western edge of the Milagro gravity anomaly, encountered 22 meters of semi-massive to massive sulphide and oxide mineralization, composed of pyrite, magnetite, hematite and chalcopyrite. Logging and sampling is in progress, which will be followed by assaying. A 400 meter step out drill hole, MW-12-02 positioned more central within the Milagro gravity anomaly, has been started to follow up this encouraging intersection. Nora Project, Target Zones C/D - Logging, sampling and assaying have been completed on the four holes within the project area, N-11-01A, B, C and N-11-02A. Nora Project, Target Zones A/B - Three deep holes have been drilled, N-11-03, -04, N-12-05 and a fourth N-12-06 is in progress. Lora SE Project - Two holes, LSE-12-01, -02 were drilled in this project area to test geophysical gravity low, resistivity and chargeability anomalies - intercepts of mineralized quartz-eye diorite porphyry and altered mineralized sediments were encountered. Logging, sampling and assaying are in progress and will be reported when completed. Cinchado Project - One deep drill hole SP-12-01, has been completed from the east side of Cinchado towards the west and underneath the old San Pedro gold mine. Logging, sampling and assaying are in progress and will be reported when completed. Drill pads have been prepared for continuation of drilling at the Virgen del Carmen, Colorina, Milagro, Florida, and the Salvadora project areas. Additional drill pads are in the process of being constructed in other project areas. A new road to access the more northern Cresta de Gallo area is under construction along the eastern range front region of the property. Current drilling at the Los Zorros Property is exploring for gold and silver at multiple project areas within the company's extensive land holdings that now cover more than 100 square kilometers. This round of drilling is following up exploration results from earlier drilling and is also testing anomalies identified by the Titan-24 geophysical survey which was completed last year. A set of three drill holes were drilled at various angles from the same pad location (drill pad N-11-01) in order to test the concept of a mantos/stratigraphic control. A fourth drill hole (DDH-N-11-02A) was positioned to drill steeply southeastward across the target interval in similar fashion to the nearby original 2004 "discovery" drill hole. Three of the holes (DDH-N-11-01A, N-11-01B, and N-11-02A) holes made successful intact intersections through the targeted stratigraphic interval of "black silica" matrix diorite breccia, and hole N-11-01C intersected a similar layer much higher in the hole than anticipated - but the intersections in these mantos/stratigraphic units did not have any significant gold content.