Saturn Metals Limited announced remaining results from its 5,800m 120 hole Reverse Circulation (RC) grade control drilling program at Saturn's planned bulk sample pit location. Broad and higher grade, intersections at and near surface include: 37m @ 2.02g/t Au from 1m including 12m @ 4.55g/t Au from 4m ­ AHRC0906, 64m @ 1.06g/t Au from 0m including 18m @ 2.63g/t Au from 9m ­ AHAC0931, 15m @ 2.45g/t Au from 0m including 7m @ 4.99 g/t Au from 0m ­ AHAC0926, 36m @ 1.34g/t Au from 10m and 9m @ 1.50g/t Au from 58m ­ AHAC0908, 33m @ 1.21g/t Au from 27m ­ AHAC0953, 31m @ 1.14g/t Au from 39m ­ AHAC0932, 31m @ 1.10g/t Au from 0m ­ AHRC0907, 15m @ 1.37g/t Au from 22m ­ AHAC0934 Drill results returned within the planned bulk sample pit area have: Provided definition of some of the deposits higher grade architecture; Highlighted the potential for a positive reconciliation between the current Mineral Resource Model and any new grade control model in this area of the deposit (potential for localised improvements in grade and tonnes); Confirmed the target area as a suitable location for a low strip bulk sample pit; Highlighted the potential for highly payable ores at surface across the deposit; and Provided high confidence data for the implementation of the planned pilot heap leach and bulk sample pit operation.