Sierra Madre Gold and Silver Ltd. announced the results of four additional drill holes from the Phase I drill program at its La Tigra Gold/Silver Project in the State of Nayarit, Mexico. The Phase I drilling program at La Tigra was designed using the data acquired from extensive surface mapping, sampling and trenching programs. This work has defined a 3.5 km long structural corridor with stacked northwest striking structures. Results for the first three holes from this Phase 1 program were released on May 24, 2022.

The structures at La Tigra dip at 400 to 450 and holes 1 and 2 were drilled at -450 and hole 3, -530. As such the true width of the intersections are approximately +90% of the intersected length.