Snow Lake Resources Ltd. announced the final set of results from the 2022/2023 winter-spring drill program at its 100% owned Grass River lithium project. These results reflect the final 6,712 meters of drilling completed during the 2022/2023 winter-spring drill campaign at the Grass River lithium project. These results were not received in time to be incorporated in the mineral resource estimate included in the S-K 1300 Technical Report Summary of Initial Assessment for the Snow Lake Lithium Project released in August 2023.

These results, together with the results of the upcoming 2023/2024 winter drill program, will be incorporated into an updated mineral resource estimate to be included in the pre-feasibility study planned to be conducted on the Snow Lake Lithium Project during Fourth Quarter of 2023 and the first half of 2024. Snow Lake is currently in the process of preparing for its upcoming 2024 winter-spring drill campaign, which is designed to increase confidence in the existing mineral resources, as well as to test the extensions of the Thompson Brothers and Grass River lithium projects, both along strike and at depth.