Solis has undertaken a magnetic vector inversion (MVI) with Fathom Geophysics of historical aerial magnetic data in the Ilo Norte area using modern software and filters. Analysis of the results, including structure analysis, has outlined several magnetic susceptibility anomalies associated with high-angle cross-structures across the main Andean structural trend. There is no record of previous exploration at the Cinto Project., There is no detailed record of how outcrop or trench chip sampling was completed or the size of the samples., RC drilling was completed by Peruvian Latin Resources at Ilo Norte (8 holes for 2,690m completed in 2011) and Rio Tinto at Ilo Este (12 holes for 2,128m completed in 2000)., Apart from collar locations there are no other records available for the Rio Tinto drilling., The RC holes completed by Peruvian Latin Resources had 1,345 samples collected over 2m intervals., Diamond drilling was completed by Peruvian Lat Resources at Ilo Este (3 holes for 2,073m completed in 2014-15) and Compania Minera Zahena SAC at both Ilo Norte (16 holes for 12,658 m completed in 2014) and Ilo Este (9 holes for 5,322m completed in 2015-16).

Diamond core was sampled nominally on 2m (Peruvian Latin Resources) or 3m (Compania Minera ZahenaSAC) intervals., Drilling techniques, Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc). Reverse circulation samples were collected from a rig-mounted cyclone in large plastic bags before being split down to a 4-5kg sample using a 2-tier riffle splitter and then placed into calico bags for despatch to the lab. There is no record of the bit type used for either of the RC drilling programs but the hole completed by Peruvian Latin Resources used 51/2 inch bit., Diamond drill holes completed by Peruvian Latin resources at Ilo Este were initially drilled as PQ size (85mm core diameter) to depths varying between 87-109m and were then drilled at HQ size (63.5mm core diameter) until the end of hole.

The total length and percentage of the relevant intersections logged., The RC drill holes completed by Peruvian Lat Resources were qualitatively logged for lithology, alteration and mineralisation which has been inspected qualitatively. Gold was assayed in diamond drill holes using a 30g fire assay, which is considered a total assay technique. There have been no adjustments made to the assay data., Sample data recorded in the field was entered into Excel spreadsheets and verified and cross checked against assay reports from the laboratory., Logging data was entered into Excel spreadsheets, subsequently cross checked against hand drawn summary logs., All data is stored electronically in a company server-based file system with regular offsite back-ups., Location of data points, Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation., Specification of the grid system used.

Quality and adequacy of topographic control., Drill holes completed by Peruvian LatinResources had collar surveys completed using a hand help GPS unit. Down hole surveys were not undertaken., The diamond drill holes completed by Compania MineraZhena S.A.C. had drill hole collars surveyed with a handheld GARMIN GPS (Model GPSMAP 64s) and downhole surveys completed every 50-100 m with a Ranger Survey Systems FlexIT survey tool., Data has been collected in UTM zone 19S coordinates., The Ilo topography is a 1:5,000 scale Digital. Whether sample compositing has been applied., Drilling at both deposits has been completed on both deposits has been completed on an irregular grid and at an irregular grid and at both deposit and at varying orientations.

Given the mineralisation is structurally controlled and/or discreet this current drill spacing is structurally controlled and/or discreet this current drill spacing is too wide to interpret continuity between drill holes. Given the current drill holes. Given the mineralisation is too wide to interpret continuity and at varying orientations.Given the current drill spacing is too wide To interpret continuity between drill spacing is too wide to interpreted continuity between drill spacing is toowide to interpret continuity between drill spacing is not undertaken on an irregular grid and at varying orientations.

Based on an irregular grid and at various orientations. Given the mineralization is too wide to interpret continuity within drill spacing is too wide to interpretation of drill spacing is too wide to understand this current drill spacing is too large orientations.