Technology Metals Australia Limited announced results of the pilot plant scale roasting testwork of the bulk sample collected from within the North Pit region of the Gabanintha Vanadium Project. The testwork, conducted by roasting kiln suppliers FLSmidth Inc. in Pennsylvania USA, was successful in confirming the very high vanadium solubility/recovery rates indicated from previous laboratory and sighter scale testwork. Rates ranged from 84.9% to 90.7% during continuous feed, confirming the 85% solubility /recovery to be used in the Definitive Feasibility Study ("DFS").FLSmidth is now undertaking engineering design and cost estimates for the roasting section of the process circuit. Delivery of the DFS, which remains on track for mid-2019, will ultimately be determined by the time to verify and incorporate this information in to the overall DFS model.