ValOre Metals Corp. reported the completion of the 2023 Phase 1 Diamond Drilling Program at ValOre?s 100%-owned Pedra Branca Platinum Group Elements (?PGE?, ?2PGE+Au?) Project (?Pedra Branca?) in northeastern Brazil. Highlights: 6,152 m drilled in 49 holes distributed along 8 separate exploration and resource zones; Target ultramafic (?UM?) rocks intercepted in 42 of 49 holes (794 m of UMs); 1,625 core samples sent to lab, with assays pending for 806 samples from 16 holes: Resource expansion potential confirmed at Trapiá 1, which remains largely open along-strike and down-plunge; Near surface PGE mineralization drilled at the following zones: Galante, Tróia, Nambi, Massapê, and Salvador.
Market Closed -
Other stock markets
|
5-day change | 1st Jan Change | ||
0.065 CAD | +8.33% | +8.33% | +18.18% |
1st Jan change | Capi. | |
---|---|---|
+18.18% | 8.25M | |
-5.74% | 4.11B | |
-10.88% | 3.34B | |
+2.65% | 1.55B | |
+33.83% | 1.25B | |
+32.63% | 917M | |
+82.85% | 881M | |
-24.60% | 561M | |
+12.36% | 558M | |
-.--% | 153M |
- Stock Market
- Equities
- VO Stock
- News ValOre Metals Corp.
- ValOre Metals Corp. Completes Phase 1 Drill Program at Pedra Branca PGE Project, Brazil