Ventnor Resources Limited has planned a follow up diamond drilling program at the Fire Dragon prospect in the Biranup Project area, 370 kilometres north-east of Kalgoorlie in Western Australia. The program follows a two-hole Reverse Circulation (RC) program in late 2016, following up on two targets generated from the previous MLEM survey. The company will mobilise a multi-purpose RC and diamond drill to site later this month. This rig will drill an RC pre-collar with a diamond tail to drill deeper down the conductor and to generate drill core. This will allow for a much better understanding of the host rocks in the Fire Dragon area and to intersect the strongest conductive area, testing for nickel and copper sulphides. In addition to this, the drill hole will be cased with PVC to undertake a DHEM survey, and if possible, the 2 RC holes will have the PVC re-instated to be included in that survey. Assays for this program are expected towards the end of the March quarter.