28 February 2022
ASX Release:
Coal Resources and Coal Reserves statement for year ending 31 December 2021
On an attributable basis the Yancoal group total year-end 31 December 2021 position is as follows:
31-Dec-2021 | 31-Dec-2020 | % Change | |
Measured, Indicated and Inferred Coal Resources 2 | 6,013Mt | 6,884Mt | -12.7% |
Recoverable Proved and Probable Coal Reserves 1 2 | 1,137Mt | 1,154Mt | -1.5% |
Marketable Proved and Probable Coal Reserves 1 2 | 819Mt | 833Mt | -1.7% |
The Coal Resources and Coal Reserves statement presented in this report was produced in accordance with the Australasian Code for reporting of Mineral Resources and Ore Reserves 2012 Edition (the JORC Code). Commodity prices and exchange rates used to estimate the economic viability of Coal Reserves are based on the Yancoal long-term forecasts unless otherwise stated. The Coal Reserves tabulated are all held within existing, fully permitted mining leases, are within areas under applications to become mining leases or are within areas of exploration tenements detailed in the 2021 Life of Mine Plans to become mining leases in future applications.
Yancoal's leases are of sufficient duration (or convey a legal right to renew for sufficient duration) to enable all Coal Reserves on the leases to be mined in accordance with current production schedules.
The information in this report relating to Coal Resources and Coal Reserves is based on information compiled by Competent Persons (as defined by the JORC Code). All Competent Persons have sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity they are undertaking to qualify as a Competent Person as defined by the JORC Code. The Competent Persons listed in this report are independent consultants, apart from the Coal Resource and Coal Reserve reports for Moolarben, the Coal Reserve reports for Mt Thorley Warkworth, Yarrabee, Ashton Underground and Donaldson, which have been compiled by fulltime employees of Yancoal, the Hunter Valley Operations (HVO) Coal Reserve report, which has been compiled by a fulltime employee of Glencore and the
- Where required the component Coal Reserve numbers for each site making up this total have been depleted by production from the annual report date to 31 December 2021.
- 2021 Coal Resources and Coal Reserves have been rounded (significant figure) by the Competent Persons in line with the JORC Code and the Yancoal Coal Resource and Reserve reporting standards to reflect the relative uncertainty of the estimates.
YANCOAL AUSTRALIA LTD - ASX RELEASE |1
For personal use only
Middlemount Coal Resource and Reserve Reports, which have been compiled by full time employees of Middlemount Coal. These Coal Resources and Coal Reserves reports were peer reviewed at the time of their generation.
Each Competent Person consents to the inclusion of the matters based on their information in the form and context in which it appears in this report.
Yancoal is not aware of any new information or data that materially affects the information included in this report and at the time of this report all material assumptions and technical parameters underpinning the estimates continue to apply and have not materially changed.3
Coal Resources and Coal Reserves are reported in 100 per cent terms (unless otherwise stated). Coal Resources are reported inclusive of the Coal Resources that have been converted to Coal Reserves (i.e. Coal Resources are not additional to Coal Reserves).
The tabulated information is reported by Project; for details of the tenements and leases containing Coal Resources and Coal Reserves comprising each of these projects please refer to the Yancoal Australia Tenements table.
The following abbreviations are used throughout this report.
AusIMM | Australasian Institute of Mining and Metallurgy |
JORC | Joint Ore Reserves Committee |
Met | Metallurgical Coal |
Semi | Semi-soft coking coal |
PCI | Pulverised Coal Injection |
Mt | Million tonnes |
OC | Open Cut |
UG | Underground |
Authorised for lodgement by the Yancoal Disclosure Committee
Investor Relations Contact: Brendan Fitzpatrick, GM Investor Relations
Email: Brendan.Fitzpatrick@yancoal.com.au
Additional information about the company is available at www.yancoal.com.au
3 The Austar mine suspended production on the 31st March2020 and transitioned to care and maintenance operations. On the 1st of March 2021, an announcement was made to transition Austar to closure activities. Coal Resources and Reserves are therefore no longer being reported for Austar.
YANCOAL AUSTRALIA LTD | 2
COAL RESOURCES FOR YEAR ENDING 31 DECEMBER 2021
For personal use only
Moisture | Measured | Indicated | Inferred | Total | ||||||||||||||||||||||||||
Yancoal | Basis | Coal Resources | Coal Resources | Coal Resources | Coal Resources | Competent | ||||||||||||||||||||||||
Project | Ownership | Coal Type | % | (Mt) | (Mt) | (Mt) | (Mt) | Person # | ||||||||||||||||||||||
% | ||||||||||||||||||||||||||||||
2021 | 2021 | 2020 | 2021 | 2020 | 2021 | 2020 | 2021 | 2021 | ||||||||||||||||||||||
Moolarben (OC & UG) | 95% | Thermal | 6.0% | 700 | 710 | 170 | 180 | 200 | 200 | 1,070 | BF | |||||||||||||||||||
(1) | Mt Thorley (OC & UG) | 80% | Semi/Thermal | 6 to 8% | 203 | 280 | 150 | 160 | 75 | 160 | 428 | CH | ||||||||||||||||||
(1) | Warkworth (OC & UG) | 84.47% | Semi/Thermal | 6 to 8% | 497 | 590 | 260 | 420 | 175 | 440 | 932 | CH | ||||||||||||||||||
HVO (OC) | 51% | Semi/Thermal | 6 to 8% | 780 | 800 | 1,300 | 1,300 | 2,400 | 2,400 | 4,480 | LP | |||||||||||||||||||
Yarrabee (OC) | 100% | PCI/Thermal | 5.5% | 60 | 75 | 60 | 85 | 13 | 50 | 133 | CH | |||||||||||||||||||
(2) | Gloucester (OC) | 100% | Met/Thermal | 6.0% | 8 | 8 | 195 | 195 | 110 | 110 | 313 | JB | ||||||||||||||||||
Middlemount (OC) | 50% | Coking/PCI | 5.0% | 83 | 57 | 56 | 53 | 19 | 8 | 158 | AC | |||||||||||||||||||
(3) | (4) Austar (UG) | 100% | Met | 5.0% | 0 | 110 | 0 | 40 | 0 | 70 | 0 | N/A | ||||||||||||||||||
(4) | Ashton (OC & UG) | 100% | Semi/Thermal | 6.5% | 85 | 85 | 95 | 85 | 90 | 90 | 270 | PH | ||||||||||||||||||
(4) | Donaldson (OC & UG) | 100% | Semi /Thermal | 4.0% | 190 | 190 | 400 | 400 | 100 | 100 | 690 | RD | ||||||||||||||||||
Monash (UG) | 100% | Met/Thermal | 6.0% | 0 | 0 | 17 | 17 | 80 | 80 | 97 | RD | |||||||||||||||||||
Total Coal Resources (100% Basis) | 2,606 | 2,905 | 2,703 | 2,935 | 3,262 | 3,708 | 8,571 | |||||||||||||||||||||||
Yancoal Attributable Share | 6,013 | |||||||||||||||||||||||||||||
Note: 2021 Coal Resources have been rounded in line with the JORC Code and the Yancoal reporting standards to reflect the relative uncertainty of the estimates
Note: All Coal Resources are inclusive of Coal Reserves and are reported on a 100% basis with Yancoal's ownership percent reported for each deposit. The attributable share total is the total Coal Resources when the Yancoal ownership percent (as at 31 December 2021) is applied.
Note: The Oaklands project has been relinquished.
- MTW operations primary changes are due to Bulga Exclusion Zone, Southern Biodiversity Area, Resource Re-classifications and Sterilisation of Resources.
- Gloucester comprises the Stratford, Duralie and Grant & Chainey deposits.
- The Austar mine suspended production and transitioned to care and maintenance operations after 31 March 2020. On the 1st of March 2021, an announcement was made to transition Austar to closure activities. Coal Resources are therefore no longer being reported for Austar.
- On 16 December 2020, Yancoal announced that a commercial arrangement had been entered into between Yankuang Group Co. Ltd, its wholly owned subsidiary Yankuang Group (Hong Kong) Limited and the other two holders of the bonds issued by Watagan which resulted in Yancoal regaining accounting control of Watagan on that date.
YANCOAL AUSTRALIA LTD | 3
COAL RESOURCES RECONCILIATION OF 2021 TO 2020 YEAR END REPORTING
Measured Resources (Mt) | ||||||||||||||
Reconciliation period 1 January 2021 to 31 December 2021 | ||||||||||||||
only | Project | Moolarben | Mt Thorley | Warkworth | HVO | Yarrabee | Gloucester | Middlemount | (2) Austar | Ashton | Donaldson | Monash | ||
(OC & UG) | (OC & UG) | (OC & UG) | (OC) | (OC) | (OC) | (OC) | (UG) | (OC & UG) | (OC & UG) | (UG) | ||||
Production Changes | ||||||||||||||
Production (-) 1 January 2021 - 31 | -46.2 | -0.24 | -16.49 | -13.5 | -3.403 | -8.4 | -2.56 | N/A | N/A | |||||
December 2021 | ||||||||||||||
Non - Production Changes | ||||||||||||||
Coal sterilised within the mine plan | -44.0 | -46.28 | -110.0 | -0.38 | ||||||||||
Bulga Exclusion Zone and Southern | -21.8 | -32.2 | ||||||||||||
Biodiversity Offset Exclusions | ||||||||||||||
Reconciliation (Actual Vs Model) | ||||||||||||||
adjustment | ||||||||||||||
Dilution/Loss change | 0.69 | |||||||||||||
Seams/Plies failing eventual economic | -17.0 | -16.9 | ||||||||||||
extraction test | ||||||||||||||
Resource reclassification | 33.0 | 2.2 | 19.75 | -12.0 | 34.4 | 0.32 | ||||||||
Geology model change | -0.8 | 4.18 | ||||||||||||
(1) Change due to significant figure rounding | 4.0 | 3.82 | -0.93 | -6.5 | 0.403 | 0.0 | 0.0 | 0.0 | -2.3 | |||||
Total | -10.0 | -77.00 | -93.0 | -20.0 | -15.0 | 0.0 | 26.0 | -110.0 | 0.0 | 0.0 | 0.0 |
use | Indicated Resources (Mt) | |||||||||||||
Reconciliation period 1 January 2021 to 31 December 2021 | ||||||||||||||
Project | Moolarben | Mt Thorley | Warkworth | HVO | Yarrabee | Gloucester | Middlemount | (2) Austar | Ashton | Donaldson | Monash | |||
(OC & UG) | (OC & UG) | (OC & UG) | (OC) | (OC) | (OC) | (OC) | (UG) | (OC & UG) | (UG) | (UG) | ||||
Production Changes | ||||||||||||||
Production (-) 1 January 2021 - 31 | -1.28 | N/A | N/A | |||||||||||
December 2021 | ||||||||||||||
Non - Production Changes | -40 | |||||||||||||
Coal sterilised within the mine plan | -37.64 | -20.09 | -0.91 | |||||||||||
Bulga Exclusion Zone and Southern | -80.75 | -161.01 | ||||||||||||
personal | Biodiversity Offset Exclusions | |||||||||||||
Dilution/Loss change | -0.24 | |||||||||||||
Seams/Plies failing eventual economic | -2.14 | -7.27 | ||||||||||||
extraction test | ||||||||||||||
Resource reclassification | -19.8 | 111.59 | 25.49 | -25.0 | 3.0 | 8.35 | ||||||||
Geology model change | 0.6 | 0.96 | ||||||||||||
(1) Change due to significant figure rounding | 9.2 | -1.06 | 2.9 | 0.0 | 0.0 | 2.4 | 0.0 | 0.0 | 0.69 | |||||
Total | -10.0 | -10.0 | -160.0 | 0.0 | -25.0 | 0.0 | 3.0 | -40.0 | 10.0 | 0.0 | 0.0 |
Inferred Resources (Mt) | ||||||||||||
Reconciliation period 1 January 2021 to 31 December 2021 | ||||||||||||
Project | Moolarben | Mt Thorley | Warkworth | HVO | Yarrabee | Gloucester | Middlemount | (2) Austar | Ashton | Donaldson | Monash | |
(OC & UG) | (OC & UG) | (OC & UG) | (OC) | (OC) | (OC) | (OC) | (UG) | (OC & UG) | (UG) | (UG) | ||
Production Changes | ||||||||||||
Production (-) 1 January 2021 - 31 | -0.3 | -0.12 | N/A | N/A | ||||||||
December 2021 | ||||||||||||
Non - Production Changes | ||||||||||||
Coal sterilised within the mine plan | -6.18 | -6.97 | -0.1 | -70 | ||||||||
Bulga Exclusion Zone and Southern | -70.65 | -139.71 | ||||||||||
Biodiversity Offset Exclusions | ||||||||||||
Seams/Plies failing eventual economic | -2.54 | -2.92 | ||||||||||
extraction test | ||||||||||||
Resource reclassification | -13.3 | -6.1 | -130.9 | -37.0 | 11.0 | 0.47 | ||||||
Geology model change | -1.9 | -2.69 | ||||||||||
(1) Change due to significant figure rounding | 15.5 | 0.47 | 15.5 | 0.0 | 0.0 | 0.22 | 0.0 | 0.0 | 2.22 | |||
Total | 0.0 | -85 | -265.0 | 0.0 | -37.0 | 0.0 | 11.0 | -70.0 | 0.0 | 0.0 | 0.0 |
Total Resources (Mt) | ||||||||||||||||
Reconciliation period 1 January 2021 to 31 December 2021 | ||||||||||||||||
For | Project | Moolarben | Mt Thorley | Warkworth | HVO | Yarrabee | Gloucester | Middlemount | (2) Austar | Ashton | Donaldson | Monash | ||||
(OC & UG) | (OC & UG) | (OC & UG) | (OC) | (OC) | (OC) | (OC) | (UG) | (OC & UG) | (UG) | (UG) | ||||||
Yancoal Ownership % | 95% | 80% | 84.47% | 51% | 100% | 100% | 50% | 100% | 100% | 100% | 100% | |||||
Coal Type | Thermal | Semi/Thermal | Semi/Thermal | Semi/Thermal | PCI/Thermal | Met/Thermal | Met/Thermal | Met | Met/Thermal | Met/Thermal | Met/Ther | |||||
mal | ||||||||||||||||
Production Changes | ||||||||||||||||
Measured Resources (Mt) | -46.2 | -0.2 | -16.5 | -13.5 | -3.4 | 0.0 | -8.4 | 0.0 | -2.6 | N/A | N/A | |||||
Indicated Resources (Mt) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | -1.3 | 0.0 | 0.0 | 0.0 | N/A | N/A | |||||
Inferred Resources (Mt) | -0.3 | 0.0 | 0.0 | 0.0 | 0.0 | -0.1 | 0.0 | 0.0 | 0.0 | N/A | N/A | |||||
Non - Production Changes | ||||||||||||||||
Measured Resources (Mt) | 36.2 | -76.8 | -76.5 | -6.5 | -11.6 | 0.0 | 34.4 | -110.0 | 2.6 | 0.0 | 0.0 | |||||
Indicated Resources (Mt) | -10.0 | -10.0 | -160.0 | 0.0 | -25.0 | 1.3 | 3.0 | -40.0 | 10.0 | 0.0 | 0.0 | |||||
Inferred Resources (Mt) | 0.3 | -85.0 | -265.0 | 0.0 | -37.0 | 0.1 | 11.0 | -70.0 | 0.0 | 0.0 | 0.0 | |||||
Totals | -20.0 | -172.0 | -518.0 | -20.0 | -77.0 | 0.0 | 40.0 | -220.0 | 10.0 | 0.0 | 0.0 | |||||
Total Coal Resource Changes (100% Basis) | -977.0 | |||||||||||||||
Yancoal Attributable Share | -871.4 |
Note: +ve = increase in reported Coal Resources, -ve = decrease in reported Coal Resources
- The reported Coal Resource totals within the Coal Resource Reports utilised for public reporting are rounded (significant figure), whereas the Coal Resource reconciliations contained within them are based on the unrounded numbers, this adjustment is required to align the unrounded reconciliations with the significant figure rounded Coal Resource totals.
- On the 1st of March 2021, an announcement was made to transition Austar to closure activities. Coal Resources are therefore no longer being reported and have been allocated as sterilized coal for reconciliation purposes.
YANCOAL AUSTRALIA LTD | 4
COAL RESERVES FOR YEAR ENDING 31 DECEMBER 2021
Recoverable Coal Reserve | Marketable Coal Reserve | ||||||||||||||||||||||||||||||||||||||||||||||||
Project | Yancoal | Coal Type | Proved | Probable | Total | Moisture | Proved | Probable | Total | Competent | |||||||||||||||||||||||||||||||||||||||
Coal Reserves | Coal Reserves | Coal Reserves | Basis | Ash | Coal Reserves | Coal Reserves | Coal Reserves | Person # | |||||||||||||||||||||||||||||||||||||||||
only | Ownership % | ||||||||||||||||||||||||||||||||||||||||||||||||
(Mt) | (Mt) | (Mt) | % | % | (Mt) | (Mt) | (Mt) | ||||||||||||||||||||||||||||||||||||||||||
2021 | 2020 | 2021 | 2020 | 2021 | 2021 | 2021 | 2021 | 2020 | 2021 | 2020 | 2021 | 2021 | |||||||||||||||||||||||||||||||||||||
Moolarben (OC) | 95% | Thermal | 162 | 178 | 5 | 6 | 167 | 9% | 21% | 133 | 144 | 4 | 5 | 137 | TB | ||||||||||||||||||||||||||||||||||
Moolarben (UG) | 95% | Thermal | 32 | 38 | 13 | 13 | 44 | 9% | 16% | 32 | 39 | 13 | 13 | 45 | LM | ||||||||||||||||||||||||||||||||||
Mount Thorley (OC) | 80.0% | Semi/Thermal | 2 | 4.6 | 16 | 14 | 18 | 10% | 10-14% | 1.3 | 3.1 | 11 | 10 | 13 | MH | ||||||||||||||||||||||||||||||||||
Warkworth (OC) | 84.47% | Semi/Thermal | 151 | 180 | 92 | 76 | 242 | 10% | 10-14% | 104 | 123 | 61 | 52 | 165 | MH | ||||||||||||||||||||||||||||||||||
HVO (OC) | 51% | Semi/Thermal | 400 | 420 | 460 | 460 | 860 | 10% | 13% | 290 | 310 | 330 | 330 | 620 | PJ | ||||||||||||||||||||||||||||||||||
Yarrabee (OC) | 100% | PCI/Thermal | 39 | 31 | 42 | 15 | 81 | 10% | 10% | 29 | 25 | 32 | 12 | 61 | MH | ||||||||||||||||||||||||||||||||||
use | (1) Gloucester (OC) | 100% | Met/Thermal | 0 | 0 | 2.4 | 17 | 2.4 | 8% | 19% | 0 | 0 | 1.4 | 10 | 1.4 | DL | |||||||||||||||||||||||||||||||||
(2) | Middlemount (OC) | 50% | Coking/PCI | 74 | 41 | 19 | 37 | 93 | 10% Coking | 10% Coking | 53 | 33 | 16 | 27 | 69 | PM | |||||||||||||||||||||||||||||||||
10.5% PCI | 10.5% PCI | ||||||||||||||||||||||||||||||||||||||||||||||||
(3) | Ashton (AWOC) | 100% | Semi/Thermal | 0 | 0 | 17 | 17 | 17 | 9.5% | 9.5% | 0 | 0 | 9 | 9 | 9 | BB | |||||||||||||||||||||||||||||||||
(3) Ashton (UG) | 100% | Semi/Thermal | 14 | 15 | 8 | 7 | 22 | 8.5% | 9.5% | 8 | 7.2 | 5 | 3.4 | 13 | REH | ||||||||||||||||||||||||||||||||||
(3) Donaldson (UG) | 100% | Semi/Thermal | 0 | 0 | 110 | 110 | 110 | 8% | 17% | 0 | 0 | 62 | 62 | 62 | REH | ||||||||||||||||||||||||||||||||||
Total Coal Reserves (100% Basis) - Rounded | 874 | 909 | 783 | 771 | 1,657 | 651 | 684 | 544 | 532 | 1,195 | |||||||||||||||||||||||||||||||||||||||
Yancoal Attributable Share | 1,137 | 819 | |||||||||||||||||||||||||||||||||||||||||||||||
Note: 2021 Coal Reserves have been rounded in line with the JORC Code and the Yancoal reporting standards to reflect the relative uncertainty of the estimates | |||||||||||||||||||||||||||||||||||||||||||||||||
personal | Note: All Coal Resources are inclusive of Coal Reserves, Coal Reserves are reported on a 100% basis with Yancoal's ownership percent reported for each deposit. The attributable share total is the total Coal Reserves | ||||||||||||||||||||||||||||||||||||||||||||||||
when the Yancoal ownership percent (as at 31 December 2021) is applied. | |||||||||||||||||||||||||||||||||||||||||||||||||
Note: The Austar mine suspended production on the 31st March2020 and transitioned to care and maintenance operations. On the 1st of March 2021, an announcement was made to transition Austar to closure | |||||||||||||||||||||||||||||||||||||||||||||||||
activities. | YANCOAL AUSTRALIA LTD - ASX RELEASE |5 | ||||||||||||||||||||||||||||||||||||||||||||||||
(1) Gloucester comprises the Stratford, Duralie and Grant & Chainey deposits. | |||||||||||||||||||||||||||||||||||||||||||||||||
(2) The project has two product types for Marketable Coal Reserves each with a different Moisture basis, Coking at 10%, PCI at 10.5% and Ash% of 10% for Coking & 10.5% for PCI. | |||||||||||||||||||||||||||||||||||||||||||||||||
(3) On 16 December 2020, Yancoal announced that a commercial arrangement had been entered into between Yankuang Group Co. Ltd, its wholly owned subsidiary Yankuang Group (Hong Kong) Limited and the | |||||||||||||||||||||||||||||||||||||||||||||||||
other two holders of the bonds issued by Watagan which resulted in Yancoal regaining accounting control of Watagan on that date. | |||||||||||||||||||||||||||||||||||||||||||||||||
r |
This is an excerpt of the original content. To continue reading it, access the original document here.