VANCOUVER, British Columbia - United Lithium Corp. (CSE: ULTH; OTC: ULTHF; FWB: 0ULA) ('ULTH' or the 'Company') is pleased to announce the first results from ongoing boulder train mapping and sampling at the Bergby Lithium Project in central Sweden. Excellent results have been returned from an area west of the northern end of the previously drilled lithium mineralized pegmatite. These new boulder trains are not related to drilled mineralization and are believed related to new lithium mineralized bodies.

These results include 3.01% Li2O, 2.82% Li2O and 2.12% Li2O (see Table 1 and Figures 1 and 2). 300m to 500m northwest of the southwestern end of the previously drilled lithium mineralized pegmatite, values returned include 1,71% Li2O, 1.72% Li2O, and 1.46% Li2O (see Table 1 and Figures 1 and 3). And 600m west of the previously drilled southwestern end of the previously drilled lithium mineralized pegmatite, values returned include 3.33% Li2O (see Table 1 and Figures 1 and 3).

The success of this boulder sampling program has encouraged United Lithium to expand the mapping and sampling program. Additional boulder samples have been sent for analysis to ALS Limited and field work is on-going.

Furthermore, a soil sampling program has been completed in the vicinity of the interpreted source of the northern spodumene boulder train. Samples were dried and sieved with -63 m fraction sent to ALS Limited for analysis including Li-Ta-Cs-Rb.

'Recent mapping and sampling has greatly expanded the footprint of lithium mineralized pegmatite at our Bergby Project' states Michael Dehn, President and CEO. 'An extensive area has been identified with spodumene bearing boulders, and we see significant potential to find multiple lithium bearing pegmatite dykes. We have consequently expanded the claim holding at Bergby to secure additional targets. Our mapping and sampling shall continue as long as weather permits, and drilling is expected to continue at least until year end.'

In an interview last week with Olov Abrahamsson, Swedish Prime Minister Stefan Lofven, stated:

'Sweden needs more mines to cope with climate change,' says Lofven. 'Employment and business policy need to be intertwined with the climate issue.' We at United Lithium see this as positive support from the Swedish Government for future mine development in Sweden for lithium minerals.

Bergby was discovered by the Leading Edge Materials team early in 2016, and has already thrown up both high grades and a high hit rate of potentially mineralized pegmatite.

Bergby lies in central Sweden, 25km north of the town of Gavle, initially secured by three exploration permits that covered a total of 1,903 hectares (Bergby nr 1, 2, and 3).

The site is close to infrastructure, with major roads, rail and power supply passing immediately adjacent to the Bergby project.

The Bergby Project was acquired by United Lithium from Leading Edge Materials in April 2021 when the property consisted of four exploration permits (Bergby nr 1, 2, 3 and 5) for a total of 3,155 hectares.

Recently the company applied for and was granted Bergby nr 4, 6, and 7 contiguous to the initial four exploration permits based the United Lithium suspicion that the mineralizing system at Bergby in much larger than previously thought. The total Bergby Project area is now 10,458 hectares (see figures 4 and 5.)

On Behalf of The Board of Directors

Michael Dehn

Chief Executive Officer

Contact:

Investor Relations

(604) 259-0889

ir@unitedlithium.com

Forward-Looking Statements Caution

This news release contains 'forward-looking information' within the meaning of applicable securities laws relating to statements regarding the Company's business, products and future of the Company's business, its product offerings and plans for marketing. Although the Company believes that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct. Readers are cautioned not to place undue reliance on forward-looking information. Such forward-looking statements are subject to risks and uncertainties that may cause actual results, performance and developments to differ materially from those contemplated by these statements. Except as required by law, the Company expressly disclaims any obligation and does not intend to update any forward-looking statements or forward- looking information in this news release. Although the Company believes that the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct and makes no reference to profitability based on sales reported. The statements in this news release are made as of the date of this release.

(C) 2021 Electronic News Publishing, source ENP Newswire