Alt Resources has announced that it completed 21 RC drill holes for 1,040 metres at the Bottle Creek Gold Project. The drilling at VB North was the first area drilled during the recently completed 3,400 metre RC drilling program undertaken at Bottle Creek and the Tim's Find Project areas during September 2019. The area drilled at VB North is an un-mined mineralised zone that lies approximately five hundred metres north of the most recent drilling undertaken at Bottle Creek and announced December 20181 which continues to reveal coherent mineralisation that appears open at depth as seen in Sections AA, BB, CC. The cross-sections show the geological and structural relationship between the felsic quartz porphyry intrusion, the chemically reducing black shale, all hosted within variable mafic volcanics. With section AA' also showing that some of the historic drilling was likely stopped prematurely. The recent results, coming from 1,040 metres drilled in 21 shallow RC holes, again provides the Company with confidence to enhance the project economics through cost effective drill programs targeting the shallow oxide ore zones at Bottle Creek. The mineralised ore zone remains open at depth. With the deepest hole in the recent program drilled to 80 metresthe Company intends to test the depth extension at VB North during the next round of RC drilling, planned to commence in November 2019. The final batches of the Tim's Find assay results, from the September drill program, are expected back from the laboratory in the coming weeks and will be announced to the market as soon as possible.