MEDIA RELEASE

27 January 2022

For personal use only

ASX Quarterly Report and Appendix 5B for the Period ended 31 December 2021

Highlights

  • Major drilling programmes on all four of Antipa's Projects in WA's Paterson Province were completed, with a significant number of assay results pending at 31 December and expected in Q1 2022:
    • 100% owned Minyari Dome: expanded ~53,000m (Diamond Core (DD) + Reverse Circulation (RC) drilling) - awaiting assays for 25,500m;
    • Citadel Joint Venture with Rio Tinto1: ~24,500m (DD + RC drilling);
    • Wilki Farm-in with Newcrest2: ~8,000m (RC + DD drilling); and
    • Paterson Farm-in with IGO3: ~11,500m (Air Core).
  • 100% owned Minyari Dome Project CY 2021 exploration programme continued with additional DD and RC results received during the Quarter, key highlights of which include:
    • Existing Minyari Mineral Resource infill resource definition and extensional drilling returned further multiple high-grade gold and copper intersections, including:

Minyari deposit near surface intersections:

  1. 77.0m at 1.50 g/t gold and 0.20% copper from 13.0m o 45.0m at 1.42 g/t gold and 0.06% copper from 21.0m o 67.0m at 1.10 g/t gold and 0.44% copper from 48.0m o 118.0m at 1.0 g/t gold and 0.10% copper from 201.0m o 82.0m at 0.80 g/t gold and 0.16% copper from 133.0m o 10.0m at 2.33 g/t gold and 0.39% copper from 44.0m

Minyari deposit breccia intersections at depth:

  1. 194.4m at 0.80 g/t gold and 0.06% copper from 527.0m o 20.7m at 1.97 g/t gold and 0.07% copper from 692.3.0m

WACA deposit near surface intersections:

  1. 57.0m at 1.51 g/t gold and 0.05% copper from 127.0m o 14.0m at 1.64 g/t gold and 0.12% copper from 142.0m

WACA deposit breccia intersections at depth:

    1. 76.2m at 0.90 g/t gold and 0.01% copper from 430.0m
  • Significant greenfield gold-copper discoveries from 10,500m greenfield exploration RC drill programme completed testing multiple high priority gold-copper targets all within 3.5km of the Minyari resource:

Minyari South prospect (250m southwest of the Minyari resource):

  1. 9.0m at 10.80 g/t gold and 0.60% copper from 54.0m o 10.0m at 3.00 g/t gold and 0.60% copper from 98.0m o 13.0m at 1.60 g/t gold and 0.10% copper from 31.0m

Sundown target (400m west of the Minyari resource):

  1. 42.0m at 0.53 g/t gold and 0.20% copper from 125.0m
  1. All references to 'Rio Tinto' in this document are to Rio Tinto Exploration Pty Ltd, a wholly owned subsidiary of Rio Tinto Limited.
  2. All references to 'Newcrest' in this document are to Newcrest Operations Ltd, a wholly owned subsidiary of Newcrest Mining Limited.
  3. All references to 'IGO' in this document are to IGO Newsearch Pty Ltd, a wholly owned subsidiary of IGO Limited.

For personal use only

  • Minyari results continue to extend the potential size of the Mineral Resource Estimate (MRE) (currently a combined JORC 2012 MRE of 723koz gold at 2.0 g/t and 26kt copper at 0.24% for Minyari and WACA4) and enhance a project development opportunity, including as a potential standalone development. The Minyari MRE was last updated in 2017.
  • The significantly expanded $24.5M Citadel Joint Venture Project CY 2021 exploration programme was completed, with drilling and geophysical survey results reported, including Gradient Array Induced Polarisation (GAIP) and Rimfire detailed aeromagnetics. Drilling at Calibre deposit extended the gold- copper-silver mineralisation outside the southern limits of the existing 2.1Moz gold, 104kt copper and 1.3Moz silver Mineral Resource, with key intersections including:
    • 10.6m at 2.12 g/t gold and 0.12% copper from 153.0m
    • 31.9m at 1.07 g/t gold and 0.25% copper from 413.4m
    • 126.1m at 0.43 g/t gold and 0.17% copper from 113.6m
    • 92.0m at 0.44 g/t gold and 0.16% copper from 217.3m
    • 39.9m at 0.50 g/t gold and 0.37% copper from 284.6m
  • $10M Citadel Joint Venture Project CY 2022 Exploration Programme agreed by Antipa and Rio Tinto includes follow-up at Rimfire and further regional target drill testing.
  • Drilling on Wilki Farm-in Project CY 2021 exploration programme, fully funded by Newcrest and operated by the Company, continued during the Quarter. Forty-three drill holes (7,422m) testing twelve greenfield and two brownfield targets were completed, with key intersections including:
    • 2.0m at 1.15 g/t gold from 146.0m
    • 7.0m at 1.29 g/t gold from 156.0m
    • 4.0m at 1.09 g/t gold and 0.17% copper from 211.0m
    • 1.0m at 3.65 g/t gold from 138.0m
    • 9.0m at 0.74 g/t gold from 82.0m
  • Newcrest elected to proceed to the next ($10M) stage of the Wilki Project farm-in agreement.
  • The Paterson Farm-in Project CY 2021 exploration drill programme, fully funded by IGO and operated by the Company, 168 drill holes (11,346m) and a regional / project scale soil geochemical sampling programme (2,589 samples) were completed with particular focus being the El Paso Structural Corridor which hosts the Reaper-Poblano-Serranogold-copper trend, and several new target areas. Assays are pending and expected in Q1 2022.
  • IGO met its initial (minimum) commitment of $4M in exploration expenditure on the Paterson Farm-in Project and elected to assume management of the project effective March 2022. The next stage of the Paterson Farm-in Project requires IGO to spend an additional $26M in exploration expenditure to earn a 70% joint venture interest.
  • All 2021 exploration programmes have taken account of the impact of the COVID-19 virus and also to ensure the safety and wellbeing of all stakeholders including local indigenous groups, employees and contractors, and also to comply with government restrictions aimed at stopping the spread of the virus.
  • As at Quarter end, the Company held cash of approximately $11.9 million, including $1.6 million which was cash held on behalf of farm-in parties.

Operations Review - Minyari Dome Project (including Minyari and WACA Deposits) - 100% Antipa

The Company holds a 100% interest in the 144km2 Minyari Dome Project located approximately 30km north of Newcrest's giant Telfer gold -copper silver mine and processing facility. The Minyari Dome Project includes the Minyari and WACA gold copper-silver-cobalt deposits and Mineral Resources and provides the Company with immediate exploration and future development opportunities.

4 Mineral Resource information refer to Competent Person's statement and table to the rear of this Release.

2

For personal use only

Key metrics of the Minyari Deposit include:

  • High-gradegold with copper, silver and cobalt;
  • Mineralisation commences 0 to 10 metres from the surface and extends down for more than 580 vertical metres;
  • +500m strike length;
  • Multiple zones of mineralisation occur within a mineralised corridor up to 290m in width; and
  • Remains open down dip and down plunge along strike.

Key metrics of the WACA Deposit include:

  • Located only 700m southwest of the Minyari deposit;
  • High-gradegold with copper, silver (and minor cobalt);
  • Mineralisation commences 0 to 20 metres from surface and extends for more than 340 vertical metres;
  • +650m strike length;
  • Multiple zones of mineralisation occur within a mineralised corridor up to 70m in width; and
  • Remain open down dip and down plunge along strike, including very high-grade gold shoots.

The current Mineral Resource estimates for both the Minyari and WACA deposits are summarised in Table 1 and Tables 2a-b below (Mineral Resource).

Table 1: Minyari Deposit and WACA Deposit Mineral Resource Statement

Refer to Tables 2a and 2b for additional information

*0.5 Au = Using a 0.5 g/t gold cut-off grade above the 50mRL (NB: potential "Open Cut" cut-off grade) *1.7 Au = Using a 1.7 g/t gold cut-off grade below the 50mRL (NB: potential "Underground" cut-off grade)

Deposit and Au Cut-

Resource

Tonnes

Au

Cu

Ag

Co

Au (oz)

Cu (t)

Ag (oz)

Co

off Grade*

Category

(kt)

(g/t)

(%)

(g/t)

(ppm)

(t)

Minyari 0.5 Au

Indicated

3,170

1.9

0.30

0.7

590

192,610

9,600

75,660

1,860

Minyari 0.5 Au

Inferred

660

1.7

0.24

0.6

340

36,260

1,560

13,510

220

Minyari 0.5 Au

Sub-Total

3,830

1.9

0.29

0.7

550

228,870

11,160

89,170

2,080

Minyari 1.7 Au

Indicated

230

2.6

0.29

0.9

430

18,740

650

6,800

100

Minyari 1.7 Au

Inferred

3,650

2.6

0.30

1.0

370

303,000

10,950

117,550

1,360

Minyari 1.7 Au

Sub-Total

3,880

2.6

0.30

1.0

380

321,740

11,600

124,350

1,460

Minyari

Total

7,710

2.2

0.30

0.9

460

550,610

22,760

213,520

3,540

WACA 0.5 Au

Inferred

2,780

1.4

0.11

0.2

180

121,950

3,120

15,920

500

WACA 1.7 Au

Inferred

540

2.9

0.09

0.2

230

50,780

510

3,850

120

WACA

Total

3,320

1.6

0.11

0.2

190

172,730

3,630

19,770

620

Minyari + WACA

Grand

11,030

2.0

0.24

0.7

380

723,340

26,390

233,290

4,160

Deposits

Total

3

Table 2a: Minyari Deposit Mineral Resource by gold cut-off grade regions and oxide zones

For personal use only

Oxide Zone

Resource

Tonnes

Au

Cu

Ag

Co

Au

Cu

Ag

Co

Category

(kt)

(g/t)

(%)

(g/t)

(ppm)

(oz)

(t)

(oz)

(t)

Minyari Deposit using a 0.5 g/t gold cut-off grade above the 50mRL (NB: "Open Cut" cut-offgrade)

Overburden

Indicated

30

1.0

0.03

0.0

20

870

0

0

0

Overburden

Sub-Total

30

1.0

0.03

0.0

20

870

0

0

0

Oxide

Indicated

180

1.8

0.27

0.3

430

10,020

480

1,680

80

Oxide

Inferred

10

1.4

0.19

0.3

270

600

30

140

0

Oxide

Sub-Total

190

1.7

0.27

0.3

410

10,620

510

1,820

80

Transitional

Indicated

730

1.7

0.27

0.5

580

40,760

1,940

12,570

420

Transitional

Inferred

80

1.1

0.17

0.3

280

3,100

140

930

20

Transitional

Sub-Total

810

1.7

0.26

0.5

550

43,860

2,080

13,600

440

Fresh

Indicated

2,230

2.0

0.32

0.9

610

140,960

7,180

61,410

1,360

Fresh

Inferred

570

1.8

0.25

0.7

350

32,560

1,390

12,440

200

Fresh

Sub-Total

2,800

1.9

0.31

0.8

560

173,520

8,570

73,850

1,560

0.5 g/t Au c.o.g.

Indicated

3,170

1.9

0.30

0.7

590

192,610

9,600

75,660

1,860

Inferred

660

1.7

0.24

0.6

340

36,260

1,560

13,510

220

above 50mRL

Sub-Total

3,830

1.9

0.29

0.7

550

228,870

11,160

89,170

2,080

Minyari Deposit using a 1.7 g/t gold cut-off grade below the 50mRL (NB: "Underground" cut-offgrade)

Fresh

Indicated

230

2.6

0.29

0.9

430

18,740

650

6,800

100

Fresh

Inferred

3,650

2.6

0.30

1.0

370

303,000

10,950

117,550

1,360

1.7 g/t Au c.o.g.

Sub-Total

3,880

2.6

0.30

1.0

380

321,740

11,600

124,350

1,460

below 50mRL

Minyari

TOTAL

7,710

2.2

0.30

0.9

460

550,610

22,760

213,520

3,540

Note:

Small discrepancies may occur due to the effects of rounding.

Table 2b: WACA Deposit Mineral Resource by gold cut-off grade regions and oxide zones

Oxide Zone

Resource

Tonnes

Au

Cu

Ag

Co

Au

Cu

Ag

Co

Category

(kt)

(g/t)

(%)

(g/t)

(ppm)

(oz)

(t)

(oz)

(t)

WACA Deposit using a 0.5 g/t gold cut-off grade above the 50mRL (NB: "Open Cut" cut-offgrade)

Oxide

Inferred

130

1.1

0.10

0.1

200

4,620

130

460

30

Transitional

Inferred

490

1.3

0.11

0.1

180

20,850

540

2,070

90

Fresh

Inferred

2,160

1.4

0.11

0.2

170

96,480

2,450

13,390

380

Sub-Total

2,780

1.4

0.11

0.2

180

121,950

3,120

15,920

500

WACA Deposit using a 1.7 g/t gold cut-off grade below the 50mRL (NB: "Underground" cut-offgrade)

Fresh

Inferred

540

2.9

0.09

0.2

230

50,780

510

3,850

120

WACA

TOTAL

3,320

1.6

0.11

0.2

190

172,730

3,630

19,770

620

Note:

Small discrepancies may occur due to the effects of rounding.

The Company engaged consultants Optiro Pty Ltd to complete an independent Mineral Resource Estimate (MRE) and subsequent reporting, in accordance with the 2012 JORC Code, for the Minyari and WACA deposits. Both deposits are potentially amenable to open pit and underground mining methods.

4

The Minyari Dome Project, including the Minyari and WACA deposits, are not subject to the Citadel Project Joint Venture with Rio Tinto, the Wilki Project Farm-in with Newcrest or the Paterson Project Farm-in with IGO (refer below).

For personal use only

2021 Minyari Dome Project Exploration Programme

The expanded Minyari Dome Project CY 2021 exploration programme, which was commenced in May and was completed late December, included the following:

  • A significant DD and RC drill programme (42,666m) focused on the Minyari and WACA deposits with
    • Test for both extensions and new zones highgrade Minyari-WACA goldcopperoftothe following objectives:

mineralisation; and

Upgrade the Minyari-WACA Mineral Resource estimate.

Minyari-WACA project development study, key components including;

Mining study (both open pit and underground);

Geotechnical evaluation;and

Further metallurgical test work.

Undertake a Minyari-WACA downhole electromagnetic (DHEM) survey to identify the location of potential high grade sulphide rich breccias similar to the Havieron "Sulphide Crescent Zone";

A significant greenfield exploration programme, including RC drilling (10,530m), focused on delivering significant gold and/or copper discoveries within 4km of the existing Mineral Resources that can enhance the Minyari-WACA development opportunity. The key components of this greenfield exploration programme are:

Detailed Drone (UAV) Magnetic Survey (completed) - Survey with 20m line spacing to enhance deposit, prospect, and greenfield targeting via the identification of key lithologies, structures, and magnetic anomalies;

GAIP Survey (completed) - To identify IP chargeability (± resistivity ± conductivity) anomalies related to gold-copper sulphide mineralisation and also map certain key lithologies;

Surface Geochemical Programme (ongoing) - Systematic fine-fraction soil programme across significant areas of the Minyari Dome Project to generate further priority greenfield targets for drill testing in CY 2022; and

RC Drill Programme - 10,530m (43 RC drill holes) testing approximately 14 geophysical and/or geochemical (air core) greenfield targets.

The Company's Paterson Province dual exploration strategy strives to deliver both greenfield discoveries and increase brownfield gold and/or copper resources plus identify and evaluate potential mineral development projects. Future exploration activities within the Minyari Dome Project are complementary to this strategy.

2021 Minyari Dome Project Exploration Programme Results

During the Quarter further DD and RC drilling results (received for 61 drill holes including RC, DD-tails and DD drill holes) at Minyari continued to return multiple high-grade gold and copper intersections, including further significant greenfield gold-copper discoveries outside the existing Minyari-WACA Mineral Resources. Key highlights and significant drill results received post the previous Quarterly Report are summarised below:

Minyari Mineral Resource Definition Drill Programme:

  • Further 52 Minyari and WACA deposit drill hole assays received during the Quarter returned significant high-grade gold and copper (± silver and cobalt) extending the potential size of the Minyari and WACA resources:
    Minyari deposit near surface intersections:
  • 77.0m at 1.50 g/t gold and 0.20% copper from 13.0m down hole in 21MYC0230, including: o 7.0m at 2.30 g/t gold and 0.46% copper from 16.0m
    o 1.0m at 13.55 g/t gold and 0.77% copper from 53.0m o 4.0m at 6.36 g/t gold and 0.56% copper from 68.0m o 4.0m at 9.74 g/t gold and 0.60% copper from 85.0m
  • 45.0m at 1.42 g/t gold and 0.06% copper from 21.0m down hole in 21MYC0257, including: o 11.0m at 4.23 g/t gold and 0.11% copper from 35.0m
  • 67.0m at 1.10 g/t gold and 0.44% copper from 48.0m down hole in 21MYC0280, including:

5

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Antipa Minerals Ltd. published this content on 26 January 2022 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 26 January 2022 21:19:26 UTC.