NEWS RELEASE, 20 OCTOBER 2021

Q3 2021 PRODUCTION REPORT

STEADY QUARTER AND LOWER COST GUIDANCE

Antofagasta plc CEO, Iván Arriagada said: "Our copper production and cost performance during the quarter was in line with our expectations despite external pressures such as the ongoing drought in Chile, the global supply chain challenges, the energy crisis and higher input costs.

"Year-to-date production and net cash costs were very similar to last year at 542,600 tonnes at $1.15/lb and we remain on track to deliver on our previously stated production guidance of 710-740,000 tonnes for the full year and, despite input cost pressures, our net cash costs are now expected to be lower than our original guidance of $1.25/lb.

"Since we last reported, there has been no material rainfall at our operations and as we head into the summer months, we do not expect any rain until the next rainy season, which begins in June next year. The construction of the desalination plant at Los Pelambres is on track for completion in H2 2022 and we now anticipate Group production in 2022 to be between 660,000 and 690,000 tonnes reflecting the previously advised production tonnes at risk at Los Pelambres due to the weather, and lower grades at Centinela Concentrates.

"The COVID-19 situation in Chile continues to improve but the measures we implemented last year will stay in place as we continue to prioritise the health and safety of our employees and surrounding communities. While we expect the extraordinary global supply chain events and energy crisis to ease over time, we remain focused on controlling costs while progressing our current and future growth projects."

HIGHLIGHTS

PRODUCTION

  • Group copper production in Q3 2021 was 181,100 tonnes, 1.5% higher than in the previous quarter on higher production at Centinela, partly offset by lower throughput at Los Pelambres
  • Group copper production for the first nine months of the year was 542,600 tonnes, 0.2% higher than in the same period last year mainly on expected higher grades at Centinela Concentrates, offset by expected lower grades at Los Pelambres
  • Gold production for the quarter was 66,800 ounces, 8.8% higher than in the previous quarter, and for the year-to-dateproduction rose by 25.4% to 187,300 ounces, both increases as a result of higher grades at Centinela
  • Molybdenum production in the quarter was 2,600 tonnes, 7.1% lower than the previous quarter on lower grades and recoveries at Centinela. For the year-to-date,production was 8,400 tonnes, 500 tonnes lower than in the same period last year

CASH COSTS

  • Cash costs before by-product credits in Q3 2021 were $1.79/lb, 2c/lb higher than in the second quarter. The global energy and supply chain crisis over Q3 resulted in higher commodity and therefore input prices, such as energy and diesel. However, evidence of wage inflation has been limited to temporary hires mostly for projects while the labour market has yet to recover to pre COVID-19employment levels. The weaker Chilean peso in Q3 has offset the higher input costs.
  • Cash costs before by-product credits for the first nine months of the year were $1.75/lb, 13.6% higher than in the same period last year primarily because of the stronger Chilean peso (8%) and higher energy and diesel prices

1

  • Net cash costs were $1.16/lb in Q3 2021 and $1.15/lb for the year-to-date,a 2.7% increase compared with the previous quarter and 0.9% higher than the same period last year. This was primarily due to higher cash costs before by-productcredits, mainly offset by higher by-productcredits on higher realised prices

GUIDANCE

  • Copper production guidance for the full year of 710-740,000 tonnes is unchanged from the update provided in August. Net cash costs are expected to be below the originally guided $1.25/lb
  • Accelerated mine development at Centinela and sustaining capex at Los Pelambres have increased expected capital expenditure for the year to between $1.6 and $ 1.8 billion. This level is similar to current estimates for 2022 as sustaining and mine development expenditure increase, and development expenditure continues
  • In 2022 copper production is expected to be 660-690,000 tonnes, as grades decrease at Centinela Concentrates and assuming there is no precipitation until the next rainy season and the desalination plant comes into operation in H2 2022

SUSTAINABILITY

  • In line with the UN Sustainable Development Goals and after a voluntary and independent evaluation process, Centinela and Zaldívar obtained the Copper Mark, the global standard for the copper industry that demonstrates responsible and sustainable production. The Copper Mark is among the first group of standards LME brands can indicate to demonstrate their sustainability credentials
  • The Company released aprogress reporton its implementation of the recommendations of the Task Force on Climate-Related Financial Disclosures (TCFD). The report provides an overview of the Company's TCFD- related work to date and its climate resilience response

OTHER

  • As at the end of Q3 the Los Pelambres Expansion project was 59% complete (design, procurement and construction). Completion of the desalination plant is expected in H2 2022 and of the concentrator plant expansion by the end of 2022
  • At Zaldívar construction of the Chloride Leach project at the end of Q3 was 90% complete and is expected to be completed on schedule and according to plan in H1 2022
  • During the quarter, the first autonomous trucks were delivered to the Esperanza Sur pit
  • Some shipments were delayed by adverse weather over the period end and were shipped in early October

GROUP PRODUCTION AND CASH COSTS

Year to Date

Q3

Q2

2021

2020

%

2021

2021

%

Copper production

kt

542.6

541.3

0.2

181.1

178.4

1.5

Copper sales

kt

528.4

536.1

(1.4)

182.3

163.4

11.6

Gold production

koz

187.3

149.4

25.4

66.8

61.4

8.8

Molybdenum production

kt

8.4

8.9

(5.6)

2.6

2.8

(7.1)

Cash costs before by-product credits (1)

$/lb

1.75

1.54

13.6

1.79

1.77

1.1

Net cash costs (1)

$/lb

1.15

1.14

0.9

1.16

1.13

2.7

  1. Cash cost is a non-GAAP measure used by the mining industry to express the cost of production in US dollars per pound of copper produced.

There will be a Q&A video conference call at 1:00pm BST hosted by Iván Arriagada - Chief Executive Officer, Mauricio Ortiz - Chief Financial Officer and René Aguilar, Vice President - Corporate Affairs and Sustainability. Participants can join the conference call here.

2

Investors - London

Media - London

Andrew Lindsay

alindsay@antofagasta.co.uk

Carole Cable

antofagasta@brunswickgroup.com

Telephone

+44 20 7808 0988

Telephone

+44 20 7404 5959

Rosario Orchard

rorchard@antofagasta.co.uk

Telephone

+44 20 7808 0988

Media - Santiago

Pablo Orozco

porozco@aminerals.cl

Carolina Pica

cpica@aminerals.cl

Telephone

+56 2 2798 7000

Register on our website to receive our email alerts http://www.antofagasta.co.uk/investors/email-alerts/

TwitterLinkedIn

3

MINING OPERATIONS

Los Pelambres

Copper production at Los Pelambres during the quarter was 81,100 tonnes, 3.9% lower than in the previous quarter as throughput reduced by 3.2%. This was primarily due to decreased plant run-time because of an unscheduled stoppage at one of the SAG mills and operational measures taken to optimise the use of water.

In the first nine months of 2021, copper production was 250,400 tonnes, 6.9% lower than in the same period last year. This decrease was primarily due to the expected lower copper grade, partially offset by higher throughput driven by improved plant performance.

Molybdenum production was 2,400 tonnes in Q3 2021, the same as the previous quarter, and for the year-to-date was 7,500 tonnes, 400 tonnes lower than the same period last year as a result of lower grades and recoveries.

Cash costs before by-product credits in Q3 were $1.60/lb, 2.6% higher than in previous quarter and for the first nine months of 2021 were $1.54/lb, 23.2% higher than the same period last year. This was due to the decrease in production, the stronger Chilean peso, higher input prices and the payment of a one-off signing bonus in Q1 following the successful completion of labour negotiations.

Net cash costs were unchanged from Q2 at $0.81/lb, and for the year-to-date were $0.82/lb, in line with the same period last year. The higher cash costs before by-product credits were fully offset by by-product credits increasing from 43c/lb to 72c/lb on the significantly higher realised molybdenum price.

As previously announced, the major maintenance delayed by COVID-19 from Q2 will now take place in Q4.

As at the end of Q3 the Los Pelambres Expansion project was 58.8% complete, and completion of the desalination plant is expected in H2 2022 and of the concentrator plant expansion by the end of 2022.

LOS PELAMBRES

Year to Date

Q3

Q2

2021

2020

%

2021

2021

%

Daily ore throughput

kt

161.9

159.9

1.3

158.0

163.3

(3.2)

Copper grade

%

0.65

0.71

(8.5)

0.64

0.65

(1.5)

Copper recovery

%

89.9

89.9

0.0

90.3

90.2

0.1

Copper production

kt

250.4

269.1

(6.9)

81.1

84.4

(3.9)

Copper sales

kt

234.7

268.9

(12.7)

69.1

84.9

(18.6)

Molybdenum grade

%

0.020

0.020

0.0

0.018

0.021

(14.3)

Molybdenum recovery

%

84.4

85.9

(1.7)

83.9

83.9

0.0

Molybdenum production

kt

7.5

7.9

(5.1)

2.4

2.4

0.0

Molybdenum sales

kt

7.0

7.5

(6.7)

2.1

2.3

(8.7)

Gold grade

g/t

0.045

0.047

(4.3)

0.037

0.048

(22.9)

Gold recovery

%

71.0

72.5

(2.1)

83.0

64.9

27.9

Gold production

koz

41.4

43.7

(5.3)

13.4

13.8

(2.9)

Gold sales

koz

36.9

41.7

(11.5)

11.1

12.9

(14.0)

Cash costs before by-product credits (1)

$/lb

1.54

1.25

23.2

1.60

1.56

2.6

Net cash costs (1)

$/lb

0.82

0.82

0.0

0.81

0.81

0.0

(1) Includes tolling charges of $0.17/lb in Q3 2021, $0.17/lb in Q2 2021, $0.16/lb YTD 2021 and $0.18/lb YTD 2020

4

Centinela

Centinela produced 70,700 tonnes of copper during the quarter, 8.4% higher than in the previous quarter on higher copper grades at Centinela Concentrates and higher throughput at Centinela Cathodes. Production for the year-to- date was 202,800 tonnes, 14.7% higher than in the same period last year, due to higher ore grades and throughput at Centinela Concentrates.

Production of copper in concentrate was 47,600 tonnes in Q3 2021, 5.5% higher than in the previous quarter. For the first nine months of the year, copper in concentrate production was 138,000 tonnes, compared with 106,900 tonnes in the same period last year, reflecting higher ore grades and throughput.

Copper cathode production during the quarter was 23,200 tonnes, 14.9% higher than Q2 2021 primarily as throughput increased by 9.0%. For the year-to-date, copper cathode production was 64,800 tonnes, 7.4% lower than in the same period last year mainly due to expected lower grades and recoveries, despite higher throughput.

Gold production was 53,400 ounces in the quarter, 12.2% higher than the previous quarter on higher grades, and for the first nine months was 145,900 ounces, 38.0% higher than the same period last year, due to higher throughput and grades.

Cash costs before by-product credits were $1.86/lb, 2.2% higher than in the previous quarter. Cash costs before byproduct credits for the first nine months of the year were $1.82/lb, 2.2% lower than the same period in 2020 as a result of higher copper production, partially offset by a stronger Chilean peso and higher input costs.

By-product credits in Q3 were $0.72/lb compared with $0.78/lb in Q2. For the first nine months of 2021, by-product credits increased from $0.55/lb in 2020 to $0.72/lb in 2021 due to higher gold production and the improved realised molybdenum price.

Net cash costs in Q3 2021 were $1.14/lb, 9.6% higher than the previous quarter on lower by-product credits. During the first nine months of the year net cash costs were $1.10/lb, 16.0% lower than same period last year due to lower cash costs before by-product credits and higher by-products credits.

During the quarter, the first autonomous trucks were delivered which will be used at the Esperanza Sur pit from the first half of 2022.

5

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original document
  • Permalink

Disclaimer

Antofagasta plc published this content on 20 October 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 20 October 2021 06:10:05 UTC.