Arras Minerals Corp. announced the commencement of a regional field program across the more than 3,300 square kilometre license package it controls in Pavlodar, Kazakhstan. Highlights of the Planned 2024 Regional Field Program: The 2024 Exploration program will target licences associated with the Teck Strategic Alliance, and Arras's 100% owned Elemes and Tay projects.

An extensive airborne and ground geophysics program, followed by a mapping, soil sampling and drill program over the Package A and Package B Licences under the Strategic Alliance with Teck Resources Limited ("Teck"). A geophysics and detailed mapping program followed an initial diamond drill program targeting the Berezski and Aimandai copper targets located within the Elemes Project. An initial scout KGK program followed by an initial diamond drill program on the Tay Project, targeting the 6.5-kilometre x 2.1-kilometre Induced Polarization ("IP") chargeability anomaly.

A paved highway runs through the licence, and within 5 km of the two targets. 1100 KVA power lines and heavy rail all lie within a 15-kilometre radius of the project. Over the coming months, both targets will be mapped in detail along with ground geophysics to better refine the drill targets.

A diamond drill program is planned to follow to test these two exciting new targets. The Tay IP Target: The Tay IP Target is a 6.5-kilometRE x 2.1- kilometre East-West trending coherent Soviet-era Induced Polarization ("IP) chargeability anomaly located 28 kilometres north of theozshakol open pit copper-gold mine, and 85-kilometres from Arras's operational base in the city of Ekibastuz. The entire prospect is masked with unconsolidated cover believed to be 10-40m deep and has received no systemic modern exploration to date.

The Tay Prospect is strategically situated with outstanding accessibility and local infrastructure, including nearby high voltage power lines, railway, and roads. Plans are underway to follow up the chargeability anomaly with a KGK drill program which will drill through the overburden and test the top of bedrock to understand the geology and then follow up with a diamond drillhole program to test the chargeability high.