Golden Rim Resources Ltd. announced that its major resource definition drilling program at its 100% owned Kouri Gold Project (Kouri) in Burkina Faso continues to deliver positive results. Assay results for a further seven reverse circulation (RC) holes drilled on the Guitorga Lodes have been received (BARC199 - 205). Results were received for five holes (BARC199 - BARC203) on Guitorga Hill which lies to the northeast of the Exploration. Target where the gold mineralization is currently being exploited by artisanal miners beneath a prominent laterite capped hill. Earlier results from the current drilling program extended the strike of gold mineralization into this area. Significant and multiple gold intercepts were obtained in all five holes and mineralization remains open at depth. The new drilling results indicate that the Guitorga Lodes extend for a further 250m to the northeast and confirm that significant gold mineralization continues for at least 400m to the northeast of the Exploration Target. Infill and extensional resource drilling is steadily covering the total strike length of over 3km of the Guitorga Lodes. Assay results received to date cover approximately 1.8km of strike on the Guitorga Lodes, including 1.3km in the northeast portion of the Guitorga Lodes and 0.5km in the centre of the Guitorga Lodes. Significantly, drilling has now commenced on the 650m gap within the area comprising the Exploration Target that also forms part of the strike length of the Guitorga Lodes. To date, a total of 11,200m of RC drilling has been completed of the planned 15,000m RC drilling program while assays have been obtained for 10,230m of the drilling. The Company now plans to extend the RC drilling program to 17,500m. Under its drilling for equity agreement with Ausdrill. The additional drilling metres will cover the extra holes recently completed at Guitorga Hill, which were not included in the initial planned program, and will provide some flexibility for further infill drill holes in the gap area.