Bondada Engineering Limited has received blanket work orders from M/s. Bharti Airtel Limited, the important terms and conditions of which are mentioned as: Significant terms and conditions of order(s): Supply of 6 Mtr Height GI pole Wt 60kg (Hot Dipped Galvanised) without Base and supply of 6 Mtr Height GI pole Wt 66kg (Hot Dipped Galvanised) without Base, 42,500 qty amounting to INR 275,825,000/- (including GST) to Haryana. Size of the order(s)/contract(s): INR 275,825,000/- (Including GST).
Delayed
Other stock markets
|
5-day change | 1st Jan Change | ||
1,870 INR | -4.35% | +15.25% | +392.15% |
May. 08 | Bondada Engineering Bags INR14 Million Order from Bharti Airtel | MT |
May. 01 | Bondada Engineering Limited Reports Earnings Results for the Full Year Ended March 31, 2024 | CI |
1st Jan change | Capi. | |
---|---|---|
+392.15% | 506M | |
+2.55% | 72.3B | |
-3.31% | 56.18B | |
+25.48% | 39.64B | |
+14.76% | 31.81B | |
+13.26% | 29.77B | |
+17.08% | 21.26B | |
+17.18% | 19.95B | |
+38.51% | 17.58B | |
+78.99% | 18.12B |
- Stock Market
- Equities
- 543971 Stock
- News Bondada Engineering Limited
- Bondada Engineering Limited Receives Blanket Work Orders from M/S. Bharti Airtel Limited