• [ Date:2017-02-20 Visits:1 ]

  •   China State Construction Engineering Corporation Ltd (CSCEC) was awarded PPP Project for Qingdao Subway Line 8 (Package B1) on February 8. The total investment amount of the Project is RMB38.7 billion, of which, CSCEC shares some RMB16.2 billion.
    The Qingdao Subway Line 8 starts from Jiaozhou North Station and ends at Wusi Plaza. With the overall length of the main line being 60km, the train is designed to be 120km/h in speed. It is the rapid backbone line linking Qingdao New Airport, North Shore urban area, and East Shore and connecting such 5 administrative areas as Jiaozhou City, Hongdao Hi-tech Zone, Licang District, Shibei District and Shinan District. It is, in addition, a core subway line in Qingdao ever with the biggest investment, the longest line and the most populous people involved. (from Infrastructure Operations)

    【print】 【closed】

China State Construction Engineering Corporation Ltd. published this content on 20 February 2017 and is solely responsible for the information contained herein.
Distributed by Public, unedited and unaltered, on 01 March 2017 03:17:11 UTC.

Original documenthttp://english.cscec.com/art/2017/2/20/art_211_347439.html

Public permalinkhttp://www.publicnow.com/view/05FEF4BC77A511C271851FDD0EDC9223EC561529