TERANGA GOLD CORPORATION

AMENDED TECHNICAL REPORT ON THE WAHGNION GOLD OPERATIONS, BURKINA FASO

Report for NI 43-101

Qualified Persons:

Stephen Ling, P.Eng

Peter Mann, FAusIMM

Patti Nakai-Lajoie, P.Geo

Ian Ward, P.Eng

William Sarunic, MAusIMM (CP (Min))

David Morgan, MAusIMM (CP)

David Gordon, FAusIMM

Jeff Martin, P.Eng

Initial Report Date: October 31, 2018

Amended Report Date: July 31, 2019

TABLE OF CONTENTS

PAGE

1 SUMMARY ......................................................................................................................

1-1

Executive Summary.......................................................................................................

1-1

Economic Analysis.........................................................................................................

1-8

cash flow analysis........................................................................................................

1-11

Technical Summary .....................................................................................................

1-11

2 INTRODUCTION .............................................................................................................

2-1

3 RELIANCE ON OTHER EXPERTS .................................................................................

3-1

4 PROPERTY DESCRIPTION AND LOCATION ................................................................

4-1

Acquisition of Interest.....................................................................................................

4-1

Mineral Tenure...............................................................................................................

4-1

Fiscal Framework - Mining Duties, Royalties, Taxes, and Other Financial Obligations..

4-3

Permits, Permitting Process, and the Mining Code ........................................................

4-4

5 ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND

PHYSIOGRAPHY...............................................................................................................

5-1

6 HISTORY ........................................................................................................................

6-1

Property Ownership .......................................................................................................

6-1

Exploration and Development History ............................................................................

6-1

Historical Mineral Resources and Mineral Reserve Estimates..........................................

6-15

Past Production ...........................................................................................................

6-17

7 GEOLOGICAL SETTING AND MINERALIZATION..........................................................

7-1

Regional Geology ..........................................................................................................

7-1

Local Geology................................................................................................................

7-3

Property Geology...........................................................................................................

7-7

Mineralization ..............................................................................................................

7-16

8 DEPOSIT TYPES ............................................................................................................

8-1

9 EXPLORATION ...............................................................................................................

9-1

10 DRILLING....................................................................................................................

10-1

Teranga Drilling ...........................................................................................................

10-1

Reverse Circulation Drilling..........................................................................................

10-4

Diamond Drilling ..........................................................................................................

10-5

Rotary Air Blasting .......................................................................................................

10-6

Auger...........................................................................................................................

10-6

Regional Exploration....................................................................................................

10-7

11 SAMPLE PREPARATION, ANALYSES AND SECURITY............................................

11-1

Sample Preparation .....................................................................................................

11-1

Sample Analyses .........................................................................................................

11-1

Analytical Method ........................................................................................................

11-2

Wahgnion Gold Operations, Burkina Faso

Page i

Technical Report NI 43-101

Sample Security...........................................................................................................

11-2

Quality Assurance and Quality Control.........................................................................

11-3

12 DATA VERIFICATION .................................................................................................

12-1

Resource Database .....................................................................................................

12-1

13 MINERAL PROCESSING AND METALLURGICAL TESTING.....................................

13-1

Metallurgical Testing....................................................................................................

13-1

14 MINERAL RESOURCE ESTIMATE.............................................................................

14-1

Introduction..................................................................................................................

14-1

Nogbele North Deposit.................................................................................................

14-6

Nogbele South Deposit ..............................................................................................

14-65

Stinger Deposit ..........................................................................................................

14-98

Fourkoura Deposit ...................................................................................................

14-127

Samavogo Deposit ..................................................................................................

14-145

15 MINERAL RESERVE ESTIMATE ................................................................................

15-1

Summary .....................................................................................................................

15-1

Mineral Reserve Model Description .............................................................................

15-1

Open Pit Optimization..................................................................................................

15-9

Open Pit Optimization Results ...................................................................................

15-12

Open Pit Design.........................................................................................................

15-13

Cut-off Grade.............................................................................................................

15-20

Mineral Reserve Estimate..........................................................................................

15-20

16 MINING METHODS.....................................................................................................

16-1

Project Overview..........................................................................................................

16-1

Mine Planning..............................................................................................................

16-9

Open Pit Design.........................................................................................................

16-10

Mine Production Schedule .........................................................................................

16-15

Mine Equipment.........................................................................................................

16-23

Mine Consumables ....................................................................................................

16-30

Personnel ..................................................................................................................

16-31

Geomechanics...........................................................................................................

16-34

17 RECOVERY METHODS..............................................................................................

17-1

Introduction..................................................................................................................

17-1

Process Plant Description............................................................................................

17-3

18 PROJECT INFRASTRUCTURE ..................................................................................

18-1

Mine Infrastructure.......................................................................................................

18-1

Waste Rock Disposal...................................................................................................

18-4

Tailings Disposal..........................................................................................................

18-4

Water Harvest Dam and Water Storage.......................................................................

18-6

Personnel ....................................................................................................................

18-8

19 MARKET STUDIES AND CONTRACTS......................................................................

19-1

Markets........................................................................................................................

19-1

Contracts .....................................................................................................................

19-1

Wahgnion Gold Operations, Burkina Faso

Page ii

Technical Report NI 43-101

20 ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL OR COMMUNITY IMPACT

.........................................................................................................................................

20-1

Environmental Studies .................................................................................................

20-1

Environmental Permitting.............................................................................................

20-8

International Agreements, Guidelines, and Standards ...............................................

20-10

Corporate and Social Responsibility ..........................................................................

20-10

Environmental and Social Management.....................................................................

20-11

Community Relations.................................................................................................

20-14

Rehabilitation and Mine Closure ................................................................................

20-17

21 CAPITAL AND OPERATING COSTS ..........................................................................

21-1

Capital Costs ...............................................................................................................

21-1

Operating Costs...........................................................................................................

21-5

22 ECONOMIC ANALYSIS...............................................................................................

22-1

23 ADJACENT PROPERTIES..........................................................................................

23-1

24 OTHER RELEVANT DATA AND INFORMATION........................................................

24-1

25 INTERPRETATION AND CONCLUSIONS ..................................................................

25-1

Risks and Opportunities...............................................................................................

25-2

26 RECOMMENDATIONS................................................................................................

26-1

27 REFERENCES ............................................................................................................

27-1

28 DATE AND SIGNATURE PAGE ..................................................................................

28-1

29 CERTIFICATE OF QUALIFIED PERSON....................................................................

29-1

30 APPENDIX 1 ...............................................................................................................

30-1

Wahgnion Mining Licence............................................................................................

30-2

Nianka II Exploration Permit.........................................................................................

30-3

Dierisso II Exploration Permit.......................................................................................

30-4

Nogbele II Exploration Permit ......................................................................................

30-5

Zeguedougou II Exploration Permit..............................................................................

30-6

Nogbele Sud Exploration Permit ..................................................................................

30-7

Wahgnion Gold Operations, Burkina Faso

Page iii

Technical Report NI 43-101

LIST OF TABLES

PAGE

Table 1-1 Royalties and Government Payments...............................................................

1-9

Table 1-2 Income Taxes, Working Capital, and Other.......................................................

1-9

Table 1-3 Cash Flow Summary.......................................................................................

1-10

Table 1-4 Mineral Resource Estimate as of January 31, 2018 ........................................

1-15

Table 1-5 Mineral Reserve Estimate - May 31, 2018......................................................

1-16

Table 1-6

Project Schedule.............................................................................................

1-27

Table 2-1 Summary of Qualified Persons .........................................................................

2-2

Table 4-1

Tenure Information ...........................................................................................

4-2

Table 5-1

Climatic Data ....................................................................................................

5-2

Table 6-1 Summary of Historical Drilling .........................................................................

6-13

Table 6-2 Mineral Resource Estimate as of October 2011..............................................

6-15

Table 6-3 Mineral Resource Estimate as of January 2013..............................................

6-15

Table 6-4 Mineral Reserve Estimate as of December 2012 ............................................

6-16

Table 6-5 Mineral Reserve Estimate as of 2014..............................................................

6-16

Table 6-6 Mineral Resource Estimate as of June 30, 2015.............................................

6-16

Table 10-1 Drilling Summary - January to December 2017.............................................

10-2

Table 10-2 Hillside Drill Hole Intercepts ..........................................................................

10-7

Table 10-3 Konatvogo Drill Hole Intercepts.....................................................................

10-9

Table 10-4 Kafina West Drill Hole Intercepts.................................................................

10-10

Table 10-5 Ouahiri South Drill Hole Intercepts..............................................................

10-12

Table 10-6 Petite Colline Drill Hole Intercepts...............................................................

10-13

Table 10-7 Raul Drill Hole Intercepts ............................................................................

10-14

Table 11-1 Certified Reference Materials........................................................................

11-7

Table 13-1 Comminution Test Work Result Summary ....................................................

13-3

Table 13-2 Ore Design Parameters ................................................................................

13-4

Table 13-3 Phase 1 Gravity/CIL Cyanidation Testwork...................................................

13-5

Table 13-4 2017 Testing, Composites Prepared.............................................................

13-6

Table 13-5 Gravity / Cyanidation Testwork on Primary and Oxide Master Composites:

Summary of Results .......................................................................................................

13-11

Table 13-6 Gravity / Cyanidation Testwork on FN/FS, NC/NW and NN Master Composites:

Summary of Results .......................................................................................................

13-12

Table 13-7 Composites Average Gold Recovery ..........................................................

13-14

Table 13-8 Predicted Plant Gold Recovery by Ore Type...............................................

13-15

Table 14-1 Mineral Resource Estimate as of January 31, 2018 ......................................

14-1

Table 14-2 Common Cut-off Grade and Pit Shell Optimization Parameters ....................

14-5

Table 14-3Cut-off Grades Based on Variable Surface Haul Cost...................................

14-6

Table 14-4 Summary of Nogbele North Resource Database ..........................................

14-7

Table 14-5

Nogbele North Weathering Profile Domain Codes ......................................

14-10

Table 14-6

Nogbele North Vein System Domain Codes ...............................................

14-10

Table 14-7

Descriptive Statistics of Nogbele North Gold Resource Assays ..................

14-15

Table 14-8

Nogbele North Capping Values and Statistics by Cap Group......................

14-23

Table 14-9 Composite Length Residual Analysis within Nogbele North High Grade and Low

Grade Domains ..............................................................................................................

14-26

Table 14-10

Descriptive Statistics of Nogbele North Capped Gold Composites............

14-26

Table 14-11

Nogbele North Block Model Dimensions ...................................................

14-34

Table 14-12

Nogbele North Block Model Attributes ......................................................

14-34

Table 14-13

Nogbele North Average Bulk Densities .....................................................

14-37

Wahgnion Gold Operations, Burkina Faso

Page iv

Technical Report NI 43-101

This is an excerpt of the original content. To continue reading it, access the original document here.

Attachments

  • Original Link
  • Original Document
  • Permalink

Disclaimer

Endeavour Mining plc published this content on 29 November 2021 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 29 November 2021 12:00:06 UTC.