Endurance Gold Corporation provide an update on the ongoing exploration program at its Reliance Gold Project. Assay results are reported herein for three drill holes completed in the Imperial and Diplomat target areas. The Property is road accessible and located 4 kilometres ("km") east of the village of Gold Bridge, and 10 km north of the historic Bralorne- Pioneer Gold Mining Camp which has produced over 4 million ounces of gold.

Drilling has now been conducted at the Diplomat, Imperial and Eagle Zones with eight holes completed for over 2,100 metres ("m") of the ongoing 15,000 m program which commenced in May. Highlights of the drilling results include: DDH23-065 drilled at -50 degrees at the Imperial Zone returned 8.98 gpt gold over 9.3 m including 12.44 gpt gold over 6.0 m commencing at 212.75 m downhole depth. This hole intersected Imperial Zone mineralization 55 m downdip from DDH21-009 which returned 8.47 gpt gold over 24.9 m and 65 m up-dip from DDH21-011 which returned 2.10 gpt gold over 24.9 m (see December 9, 2021 press release).

DDH23-061 and DDH23-062 were collared northwest of hole DDH23-065 to test the Diplomat Zone and the northwest strike extension of the Imperial Zone. DDH23-062 was drilled at -60 degrees and intersected the northwest strike extension of the Imperial Zone where it successfully returned 1.95 gpt gold over 12.2 m, including 12.85 gpt gold over 1.5 m commencing at 168.1 m down-hole and 189 m step out northwest from the drill intersection in DDH23-065. These two holes were also designed to test the postulated down-dip extension of the Diplomat Vein 175 m down-dip of hole RC21-024 which returned 16.39 gpt gold over 4.57 m. The Diplomat vein was not intersected in either of these holes.

DDH23-066, the deepest drill test to date by the Company, was designed to test for the down-dip plunge of Imperial Zone mineralization. This hole targeted a 60 m step-out to depth northwest from hole DDH21-011. The hole has intersected six (6) mineralized intervals with associated arsenopyrite between downhole depths of 306.5 m and 344.5 m. The individual mineralized intervals range from 0.5 m to 4.2 m in core length, for a composited mineralized core length of 12.3 m. Very strong sericite-iron carbonate alteration continues to the bottom of the hole at 409.1 m. Assay results are pending for the 131 samples sent to the laboratory.

Drilling has now been completed on two holes at the Eagle Zone and a third hole has commenced. Zones of intense silicification and local mineralization have been observed in core logging. Assay results are pending.