Galilee Energy Limited provided the following operational and project update on the Glenaras multi-well pilot ("Pilot") and announce that the existing Glenaras Pilot wells are back online with water rates approaching pre-drilling programme rates of around 18,000 BWPD. Notably, despite the extended shutdown due to numerous rainfall events during the drilling programme, which naturally saw reservoir pressure increase across the Pilot, are seeing excellent reservoir connectivity and continued good pressure drawdown across the current wells. Notwithstanding more recent rainfall events, excellent progress has also been made on the construction of an additional irrigation system which should see the new Pilot wells commissioned within the next 2 weeks, further boosting ability to ramp up water rates and accelerate pressure drawdown across the Pilot.