Independence Gold Corp. announced the commencement of a diamond drilling program at its 100% owned 3Ts Project located approximately 185 kilometres southwest of Prince George, British Columbia and situated 16 km southwest of the Blackwater Mine which is currently being developed by Artemis Gold Inc. The fall drill program will consist of approximately 16 drill holes totaling 2,000 metres ("m") and will focus on the recently announced discoveries of the Johnny and Ian Veins as well as the Ootsa copper-silver target. In addition, drilling will also focus on the southern extension of the Ted-Mint Vein System in which targets have been selected based on the updated NI 43-101 inferred resource completed in 2022 by SGS Geological Services .

Drilling will also test significant gaps between the Tommy and Ted-Mint vein systems. The estimated budget for this drill program is $650,000. The 3Ts Project is comprised of fifteen mineral claims covering approximately 5,200 hectares in the Nechako Plateau region of central British Columbia. The 3Ts Project covers a low-sulphidation epithermal quartz-carbonate vein district within which more than a dozen individual mineralized veins, ranging from 50 m to more than 1,100 m and true widths up to 25 m, have been identified.