Kintavar Exploration Inc. announced the successful completion of its maiden mineral resource estimate (“MRE”) for the Sherlock zone, Mitchi Project. The independent MRE was prepared by InnovExplo Inc. in accordance with NI 43-101 regulations. All samples have been sent and prepared (PREP-31) by ALS Global laboratory in Val-d'Or.

For base metals and silver, the pulp was sent to ALS Global laboratory in Vancouver for multi-elemental analysis by four acid digestion (ME-ICP61) with ICP-AES finish. Samples with assays higher than 10,000 ppm Cu, Zn or Pb, or 100 ppm Ag were reanalyzed with over limits methods (CU-OG62, ZN-OG62, PB-OG62, or AG-OG62) at the ALS Global Vancouver laboratory. Quality controls include systematic addition of blank samples and certified copper standards to each batch of samples sent to the laboratory.