Credit Suisse 2020 Global Steel & Mining Conference

September 10th & 11th, 2020

TSX: LUN Nasdaq Stockholm: LUMI

Candelaria, Atacama Region, Chile

Cautionary Statements

Caution Regarding Forward-Looking Information and Non-GAAP Performance Measures

This document contains "forward-looking information" within the meaning of Canadian securities laws. All statements other than statements of historical facts constitute forward-looking information, including but not limited to statements regarding plans, prospects and business strategies; timing and amount of future production; expectations regarding the results of operations and costs; permitting requirements and timelines; timing and possible outcome of pending litigation; the results of economic studies or Mineral Resource and Mineral Reserve estimations, life of mine estimates, and mine and mine closure plans; market prices of metals, currency exchange rates, and interest rates; the ability to comply with permitting or other regulatory requirements; anticipated exploration and development activities; and the integration and benefits of acquisitions. Words such as "believe", "expect", "anticipate", "contemplate", "target", "plan", "goal", "aim", "intend", "continue", "budget", "estimate", "may", "will", "can", "could", "should", "schedule" and similar expressions identify forward-looking statements. Forward-looking information is necessarily based upon various assumptions including, without limitation, the expectations and beliefs of management, including that the Company can access financing, equipment and labour; assumed and future price of metals; anticipated costs; ability to achieve goals; the effective integration of acquisitions; the political environment supporting mining projects; and assumptions related to the factors set forth below. While these factors and assumptions are considered reasonable by Lundin Mining as at the date of this document in light of management's experience and perception of current conditions and expected developments, these statements are inherently subject to significant business, economic and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected. Such factors include, but are not limited to: volatility in commodity prices; global financial conditions; risks inherent in mining including but not limited to the environment, industrial accidents, catastrophic equipment failures, unexpected geological formations or unstable ground conditions, and natural phenomena; uninsurable risks; equity markets volatility; outbreaks of viruses and infectious diseases (such as COVID-19); negative publicity and reputation risks; reliance on a single asset; fraud and corruption risks; actual ore mined and/or recoveries varying from estimates; risks associated with the estimation of Mineral Resources and Mineral Reserves and the geology, grade and continuity of mineral deposits; ore processing efficiency; foreign country and emerging markets risks; security; taxation regimes; health and safety risks; exploration, development or mining results not being consistent with expectations; infrastructure risks; counterparty and credit risks and customer concentration; environmental regulation risks; exchange rate fluctuations; stakeholder opposition; civil disruption; labour disputes or difficulties; interruptions in production; uncertain political and economic environments; litigation; regulatory investigations, enforcement and/or sanctions; structural stability of waste rock dumps or tailings storage facilities risks; changes in laws or policies; climate change; cybersecurity risks; estimates of future production, operations, capital and operating cash and all-in sustaining costs; permitting risks; compliance with laws; mine closure risks; challenges to title; the price/availability of supplies or services; liquidity risks and limited financial resources; the estimation of asset carrying values; risks relating to dividends; and other risks and uncertainties, including but not limited to those described in the "Risk and Uncertainties" section of the Annual Information Form and the "Managing Risks" section of the Company's MD&A for the year ended December 31, 2019, which are available on SEDAR at www.sedar.com under the Company's profile. All of the forward-looking statements made in this document are qualified by these cautionary statements. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, forecast or intended and readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Should one or more of these risks and uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described in forward- looking information. Accordingly, there can be no assurance that forward-looking information will prove to be accurate and forward-looking information is not a guarantee of future performance. Readers are advised not to place undue reliance on forward-looking information. The forward-looking information contained herein speaks only as of the date of this document. The Company disclaims any intention or obligation to update or revise forwardlooking information or to explain any material difference between such and subsequent actual events, except as required by applicable law.

This presentation may contains certain financial measures such as adjusted earnings, adjusted loss, EBITDA, net cash, net debt, adjusted operating cash flow per share, co-product cash costs and cash costs which have no standardized meaning within generally accepted accounting principles under IFRS and therefore amounts presented may not be comparable to similar data presented by other mining companies. This data is intended to provide additional information and should not be considered in isolation or as a substitute for measures or performance prepared in accordance with IFRS.

Note: All dollar amounts are in US dollars unless otherwise denoted.

2

Lundin Mining

Our Strategy

Operate, upgrade and grow a base metals portfolio that provides leading returns for our shareholders throughout the cycle

  • copper dominant
  • competitive cost position
  • low-riskmining jurisdictions, leverage current geographies
  • pipeline of development and exploration projects
  • maintain low leverage and flexible balance sheet while increasing direct shareholder returns

Eagle

Zinkgruvan

Nickel-Copper-PGMs in U.S.A.

Zinc-Lead-Copper in Sweden

Neves-Corvo

Copper-Zinc-Lead in Portugal

Candelaria1

Chapada

Copper-Gold-Silver in Chile

Copper-Gold in Brazil

1. Lundin Mining holds an 80% interest in Candelaria

3

Responsible Mining

2019 Sustainability Report

  • we recognize the important role of the metals we produce and are committed to mining these metals responsibly
  • we demonstrate this commitment through living our core values of Safety, Respect, Integrity and Excellence in all aspects of our decision-making
  • Lundin Mining has been reporting on our sustainability performance in a comprehensive, standalone document since 2011

https://www.lundinmining.com/responsible-mining/sustainability-reports/

COVID-19 Readiness & Response

  • across Lundin Mining we continue to identify and implement measures to protect our workforce and communities and ensure their needs are being addressed
  • providing proactive assistance and resources to our local communities to best address needs as the pandemic continues to evolve differently in each region
  • contributed approximately US$3.0 million through Q2/20 in direct relief efforts, including education, healthcare support, local business development and humanitarian aid

4

Increasing Production Profile1 (kt)

235

Copper

Gold

294 - 318

180 - 190

165 - 180

251 - 274

+30%

142

13

Nickel

15 - 18

15 - 18

2019A

2020

2021

2019A

2020

2021

2019A

2020

2021

1.

Production profile based on certain estimates and assumptions, including but not limited to; Mineral Resource and Mineral Reserve estimates geological formations, grade and continuity of deposits and metallurgical characteristics. The 2020-2021 guidance was announced by news release on November

26, 2019, with 2020 guidance and most recently revised by news release on July 29, 2020. The 2019 production results were announced in the press release dated January 22, 2020 and/or the February 20, 2020 release. Copper production for 2019 reflects attributable production for the Chapada Mine

under Lundin Mining ownership.

5

2.

Gold production guidance for Candelaria is 80-90 koz in 2020 and 110-115 koz in 2021, on a 100% basis. Currently, 68% of Candelaria's total gold and silver production are subject to a streaming agreement. Gold production guidance for Chapada is 85-90 koz in 2020 and 70-75 koz in 2021. Chapada' s gold

production is unencumbered.

H1/20 Summary Results

Ediney Drummond, Managing Director presenting during celebrations of Chapada's first year anniversary as a Lundin Mining operation on July 5, 2020

Production

Payable Sales

127,452 t of copper

125,548 t of copper

68,529 t of zinc

55,709 t of zinc

83,000 oz of gold

81,000 oz of gold

6,955 t of nickel

5,228 t of nickel

14,839 t of lead

14,336 t of lead

$911M in Sales

Lead

Other

Sweden

Nickel 2%

3%

USA

6%

6%

11%

Zinc

7%

Gold

Portugal

Chile

47%

Copper

14%

14%

68%

Brazil

22%

By Metal

By Jurisdiction

6

Candelaria

Resilient Operations in Face of COVID-19 Challenges

  • H1/20 production of 71,357 t of copper and approximately 42,000 oz of gold at cash cost of $1.33/lb of copper
  • CMOP replacement of fourth and final ball mill motor planned for scheduled maintenance downtime in January 2021
  • 2020 copper production guidance of 145,000 to 155,000 t, increasing over 25% in 2021 to 185,000 to 195,000 t
  • full year cash cost guidance of $1.35/lb of copper

Sustaining Capital & Exploration Expenditures

  • 2020 sustaining capital expenditure guidance of $230M
  • H1/20 expenditures of $130M
  • over 50,000 m drilling planned as part of $15M exploration program
  • 29,805 m of drilling completed in H1/20 with five rigs

Delivery of medical equipment and supplies as part of a two billion peso Candelaria and Atacama

Health Service agreement signed in May to help the region face the COVID-19 pandemic

Copper, Gold Production & Cash Cost1 Outlook

(100% basis; kt Cu, koz Au & $/lb Cu, net of by-product credits)

185-195

Avg. +190

146

145-155

110-115

Avg. +110

88

80-90

$1.54

$1.35

2019A

2020

2021

2022-2025

2

Copper

Gold

  1. Currently, 68% of Candelaria's total gold and silver production are subject to a streaming agreement and as such C1 cash costs guidance is based on receipt of $412/oz and $4.12/oz, respectively, in 2020 on the streamed portion of gold and silver sales.
  2. Average 2022-2025 production is based on the NI 43-101 Technical Reports dated November 28, 2018 which is available on
    SEDAR under the Company's profile page. Current copper production guidance for 2022 is 180,000 - 190,000 t on a 100% basis.

See also slide 25.

7

Candelaria Copper Production Profile1 (kt)

184

185

190

190

192

194

175

175

175

171

167

156

160

152

146

146

151

136

135

114

96

84

69

45

10

2016A

2017A

2018A

2019A

20204

20214

20224

2023

2024

2025

2026

2027

2028

2029

2030

2031

2032

2033

2034

2035

2036

2037

2038

2039

2040

December 2018 Technical Report

December 2017 Technical Report

At Purchase - October 2014 Techncial Report

Contained copper in the Mineral Reserve estimate2 has increased by approximately 130%3 and the production profile significantly improved since acquisition

  1. Production shown on 100% basis and is based on the NI 43-101 Technical Reports dated November 28, 2018, November 30, 2017, and October 6, 2014 copies of which is are available on SEDAR under the Company's profile page. See also slide 25.
  2. Refer to Press Release "Lundin Mining Announces 2020 Mineral Resource and Reserve Estimates" dated September 8, 2020. See also slide 25.
  3. Mine depletion included.
  4. Bar graph presents NI 43-101 Technical Report dated November 28, 2018 copper production forecast for 2020 through end of operational life. Current copper production guidance on a 100% basis is for 145,000 - 155,000 t in 2020, 185,000 - 195,000 t in 2021 and 180,000 - 190,000 t in 2022.

8

Chapada

Improved Grades & Recoveries

  • Q2/20 copper production increased 16% and gold production approximately 28% over Q1/20, driven by improving grades and recoveries for both metals
  • H1/20 production of 25,680 t of copper and approximately 41,000 oz of gold
  • copper cash cost of $0.54/lb in H1/20 and $0.21/lb for Q2/20 benefiting from a favourable FX rate and gold price3
  • full year cash cost guidance further improved to $0.65/lb of copper, from $0.85/lb. On-track to achieve full year copper and gold production guidance
  • full year sustaining capital expenditure guidance of $40M is unchanged

Ramp Up of Exploration Drilling

  • 9,810 m of drilling competed in H1/20
  • targeting over 40,000 m of drilling for the year as part of $7M exploration program
  • five drill rigs now on site and planning a 60,000 m drilling campaign for 2021
  • focus remains primarily on near mine targets with some regional drilling
  • study work evaluating mine and plant expansion advancing

Chapada geologist, Tais Bischof Pian, examining drill core from current drilling campaign

Copper, Gold Production & Cash Cost1 Outlook

(100% basis; kt Cu, koz Au & $/lb Cu, net of by-product credits)

85-90

70-75

75-80

54

51-56

51-56

51-56

31

$0.58

$0.65

2019A

2

2020

2021

2022

Copper

Gold

  1. Chapada cash costs are calculated on a by-product basis and do not include the effects of its copper stream agreements. Effects of the copper stream agreements are reflected in copper revenue and will impact realized price per pound.
  2. 2019 production based on period of Lundin Mining's ownership post closing of acquisition on July 5, 2019 (approximately half year).
  3. Q2/20 average market price of USD/BRL: 5.37 and $1,727/oz gold compared to assumptions of 4.75 and $1,500/oz, respectively, in
    previous guidance. Assumptions revised to USD/BRL: 5.00 and $1,600/oz gold in guidance announced by news release on July 29, 2020.

9

Chapada Production Profile1,2

Metal Production

120 100 80 60 40 20 0

2019A

3

3

3

2023

2026

2027

2030

2033

2036

2037

2040

2043

2044

2046

2047

2050

2020

2021

2022

2024

2025

2028

2029

2031

2032

2034

2035

2038

2039

2041

2042

2045

2048

2049

Copper (kt)

Gold (koz)

  1. Production shown is based on the NI 43-101 Technical Report dated October 10, 2019, available on the Company's website and SEDAR under the Company's profile page. See also slide 25.
  2. 2019 production based on period of Lundin Mining's ownership post closing of acquisition on July 5, 2019 (approximately half year).
  3. Bar graph presents NI 43-101 Technical Report dated October 10, 2019 copper and gold production forecasts for 2020 through end of operational life. Current copper production guidance is for 51,000 - 56,000 t in 2020, 2021 and 2022. Current gold production guidance is for 85,000 - 90,000 oz in 2020 and

70,000 - 75,000 oz in 2021 and 2022.

10

Neves-Corvo

New Mill Throughput Record Set

  • H1/20 production of 19,634 t of copper, 36,934 t of zinc and 3,027 t of lead
  • new throughput record set in Q2/20 with over one million tonnes milled in the quarter
  • cash cost of $1.76/lb of copper in H1/20
  • per tonne operating costs benefiting from lower contractor costs and increased throughput
  • positioned to achieve production

and cash cost guidance

Managing Director, Kenneth Norris, and Neves-Corvo CFO, Rodrigo Rosa,

meeting with Portuguese President Marcelo Rebelo de Sousa to discuss

impact of COVID-19 pandemic on economy and mining sector

Zinc Expansion Project Restart Plans in Review

  • major ZEP construction and commissioning activities remain temporarily suspended to reduce COVID-19 related risks to workforce and local communities
  • minor works to continue in H2/20 to facilitate efficient ramp-up of construction and commissioning
  • 2020 ZEP capital expenditure guidance increased to $65M, from $55M. Total pre- production expenditure remains unchanged at €360M
  • phased commissioning and production ramp-up being reviewed considering COVID-19 measures and protocols

Copper, Zinc Production & Cash Cost Outlook

(kt & $/lb Cu, net of by-product credits)

ZEP Zinc Production

Being Reviewed

73

70-75

41

35-40

41-46

41-46

$1.59

$2.10

2019A

2020

2021

2022

Copper

Zinc

11

Zinkgruvan

On-Track to Achieve Full-Year Guidance

  • H1/20 production of 31,595 t of zinc, 11,812 t of lead and 2,301 t of copper at cash cost of $0.53/lb of zinc
  • mine plan calls for return to high grade stopes in H2/20 driving increased zinc production in second half
  • on-trackto achieve full year production and cash cost guidance
  • sustaining capital expenditure guidance of $45M unchanged

Underground Exploration Advancing

Zinc Production & Cash Cost Outlook

(kt & $/lb Zn, net of by-product credits)

78

72-77

72-77

69-74

Women comprise half of this year's summer hire program, including

Emma Johansson working on the production loading team

  • exploration expenditure guidance of $6M with approximately 17,000 m drilling planned
  • 11,186 m of exploration drilling and 195 m of drifting completed in H1/20
  • exploration continues on Dalby in support of mine design and study work for future conversion to Mineral Reserves1
  • drilling has also added Inferred and Indicated Mineral Resource1 in the extensions of known mineralization

$0.60

$0.39

2019A

2020

2021

2022

1. Refer to Press Release "Lundin Mining Announces 2020 Mineral Resource and Reserve Estimates" dated September 8, 2020. See also slide 25.

12

Eagle

Improved Copper Production & Nickel Cash Cost Guidance

H1/20 production of 6,955 t of nickel and 8,480 t of copper at cash cost of $1.29/lb nickel

set a new record over 180 days without a recordable injury on May 2 and continues with

Nickel, Copper Production & Cash Cost Outlook

zero recordables now for over 300 days

positioned for a stronger H2/20 as mine sequencing calls for increasing nickel and copper

ore grades from Eagle East

full year copper production guidance increased to 17,000 to 19,000 t and nickel

production guidance reiterated at 16,000 to 18,000 t

cash cost guidance improved to $0.85/lb of nickel, from $1.00/lb, primarily on by-product

copper production and price assumption

Generating Meaningful Free

Cash Flow

2020 sustaining capital expenditure

guidance of $15M unchanged

$7.6M of sustaining capital

(kt & $/lb Ni, net of by-product credits)

16-1817-19 15-1814-17 15-18

13 14

$2.84

$0.85

17-20

expenditures in H1/20

2019A 2020 2021 2022

Nickel Copper

Meagen Morrison, Social Responsibility Advisor at Eagle Mine, displaying gift

13

card distributed to employees to support Rockin' Local campaign

Lundin Mining

High Quality

Meaningful Scale

Competitive Mines

Growth Oriented

demonstrated operational excellence and

materially increasing copper and zinc

culture of continuous improvement

production profile

low-risk mining jurisdictions

exploration upside and high-value

expansion projects underway

Financial Strength

  • proven track record for rigorous investment approach, focused on value creation
  • strong balance sheet with low leverage

14

www.lundinmining.com | TSX: LUN | Nasdaq Stockholm: LUMI

Appendices

16

2020 Guidance Summary1

Production

C1 Cash

(contained metal in concentrate)

Cost2

Copper (t)

Candelaria (100%)

145,000

-

155,000

$1.353

Chapada

51,000

-

56,000

$0.654

Eagle

17,000

-

19,000

Neves-Corvo

35,000

-

40,000

$2.103

Zinkgruvan

3,000

-

4,000

Total

251,000

-

274,000

Zinc (t)

Neves-Corvo

70,000

-

75,000

Zinkgruvan

72,000

-

77,000

$0.603

Total

142,000

-

152,000

Gold (oz)

Candelaria (100%)

80,000

-

90,000

Chapada

85,000

-

90,000

Total

165,000

-

180,000

Nickel (t)

Eagle

15,000

-

18,000

$0.85

Total

15,000

-

18,000

Sustaining Capital

Candelaria (100% basis)

230

Chapada

40

Eagle

15

Neves-Corvo

55

Zinkgruvan

45

Total Sustaining

385

ZEP (Neves-Corvo)

65

Total Capital Expenditures1,2

$450M

  • 2020 exploration guidance of $35M
  • over 110,000 m of drilling planned with focus on in and near-mine targets
  1. Guidance as outlined in the Management's Discussion and Analysis for the quarter ended June 30, 2020 and as announced by news release on July 29, 2020.
  2. Cash costs are based on various assumptions and estimates, including but not limited to: production volumes, as noted above, commodity prices (Cu: $2.35/lb, Zn: $0.85/lb, Ni: $5.25/lb, Pb: $0.75/lb, Au: $1,600/oz), foreign exchange rates (€/USD:1.15, USD/SEK:9.25, USD/CLP:800, USD/BRL:5.00) and operating costs.
  3. 68% of Candelaria's total gold and silver production are subject to a streaming agreement and as such cash costs are calculated based on receipt of $412/oz and $4.12/oz respectively, on gold and silver sales in the year. Silver production at Zinkgruvan and Neves-Corvo are

also subject to streaming agreements, and cash costs are calculated based on approximately $4.40/oz and $4.30/oz.

17

4.

Chapada cash costs are calculated on a by-product basis and do not include the effects of its copper stream agreements. Effects of the copper stream agreements are reflected in copper revenue and will impact realized revenue per pound.

Candelaria Complex - Mineral Resources and Mineral Reserves1

Ownership

80%

Location

Region III, Chile

Mine life

+20 years

2020 exploration budget

$15M

P&P Copper Mineral Reserves

3,656 kt contained (684,445 kt at 0.5%)

M&I Copper Mineral Resources

7,574 kt contained (1,179,253 kt at 0.6%)

Inferred Copper Mineral Resources

540 kt contained (77,618 kt at 0.7%)

P&P Gold Mineral Reserves

2.8 Moz contained (684,445 kt at 0.1 g/t)

M&I Gold Mineral Resources

5.6 Moz contained (1,179,253 kt at 0.1 g/t)

Inferred Gold Mineral Resources

0.3 Moz contained (77,618 kt at 0.1 g/t)

P&P Silver Mineral Reserves

39 Moz contained (684,445 kt at 2 g/t)

M&I Silver Mineral Resources

77 Moz contained (1,179,253 kt at 2 g/t)

Inferred Silver Mineral Resources

3.8 Moz contained (77,618 kt at 2 g/t)

1. For more information please refer to the Company's Technical Report for the Candelaria Copper Mining Complex, November 28, 2018 and the Company's news release dated September 8, 2020 entitled "Lundin Mining Announces 2020 Mineral Resource and Reserve Estimates" on the

Company's website (www.lundinmining.com). See also slide 25.

Candelaria Copper Mining Complex

18

Candelaria Reinvestments

Mine Fleet Reinvestment

  • significantly increased production profile and extended mine life on exploration success. Mineral Reserve estimate now supports mine life to beyond 2040
  • new equipment increases haulage efficiency. 38 new latest generation CAT 793F trucks which are faster, have larger capacity and lower operating costs. Change to hydraulic shovels in backhoe configuration
  • high-returninvestment; in excess of 20% IRR expected. $220M total investment essentially complete

Candelaria Mill Optimization Project (CMOP)

  • low-riskinvestments to increase metal production, reduce costs and improve safety
  • primary crusher motor upgrade, ball mill re-powering, pebble circuit upgrade, cyclone and feed pump upgrades, flotation circuit upgrades, front-end desalination plant and pipeline improvements

First New Candelaria Haul Truck

  • throughput capacity forecast to increase ~4 ktpd and copper recovery by ~1.7%
  • high-returninitiatives. In excess of 20% IRR expected. $80M total investment

Underground Mine Expansions

  • significant underground exploration success under Lundin Mining ownership
  • total estimated Candelaria underground Mineral Reserves1 now 160.2 Mt at 0.83% copper. Candelaria North and South Sectors continues to show significant exploration potential
  • Candelaria South Sector successfully transitioned to operations team in Q3/19. Aim to operate Candelaria North and South Sector mines to maximum combined permit-limited 14,000 tpd

1. Refer to Press Release "Lundin Mining Announces 2020 Mineral Resource and Reserve Estimates" dated September 8, 2020. See also slide 25.

Candelaria Mill

19

Chapada - General Overview

Alto

Horizonte

Chapada

Source: Google Earth

  • located in northern Goiás State
  • 270 km northwest of national capital of Brasilia and 320 km north of state capital of Goiânia
  • supported by road access with good connections to the local and national road network
  • average elevation of approximately 300 masl
  • low rolling hills with large contiguous flat areas
  • tropical climate with two well defined seasons:
    • rainy season from November to March
    • dry season from April to October
  • Alto Horizonte, the closest town, has a population of roughly 5,800 people
  • local economic activity is mainly agropastoral. Some small scale gold and clay mining activities in area
  • ± 750 employees and 1,300 contractors
  • 10% of the workforce is female
  • majority of the workforce is between 26 to 35 years old (42%) and 36 to 45 years old (32%)

20

Chapada - Mineral Resources and Mineral Reserves1

Ownership

100%

Location

Goiás State, Brazil

Mine life

+30 years

2020 exploration budget

$7M

P&P Copper Mineral Reserves

1,759 kt contained (759,652 kt at 0.23%)

M&I Copper Mineral Resources

2,639 kt contained (1,132,198 kt at 0.23%)

Inferred Copper Mineral Resources

372kt contained (171,048 kt at 0.22%)

P&P Gold Mineral Reserves

4.6 Moz contained (824,847 kt at 0.18g/t)

M&I Gold Mineral Resources

7.8 Moz contained (1,279,716 kt at 0.19 g/t)

Inferred Gold Mineral Resources

0.6 Moz contained (183,613 kt at 0.10 g/t)

1. For more information please refer to the Company's news release dated September 8, 2020 entitled "Lundin Mining Announces 2020 Mineral Resource and Reserve Estimates" on the Company's website (www.lundinmining.com). Mineral Resources are based on the summation of Chapada and Suruca gold only. See also slide 25.

Chapada deposits and near-mine exploration targets

21

Eagle Mine - Mineral Resources and Mineral Reserves1

Ownership

100%

Location

Michigan, USA

Mine life

5 years

P&P Nickel Mineral Reserves

100 kt contained (3,909 kt at 2.6%)

M&I Nickel Mineral Resources

113 kt contained (3,807 kt at 3.0%)

P&P Copper Mineral Reserves

84 kt contained (3,909 kt at 2.1%)

M&I Copper Mineral Resources

95 kt contained (3,807 kt at 2.5%)

Inferred Nickel Mineral Resources

- kt contained (21 kt at 0.9%)

Inferred Copper Mineral Resources

- kt contained (21 kt at 1.0%)

1. For more information please refer to the Company's Technical Report on the Eagle Mine dated April 26, 2017 and the Company's news release dated September 8, 2020 entitled "Lundin Mining Announces 2020 Mineral Resource and Reserve Estimates" on the Company's website (www.lundinmining.com). See also slide 25.

Eagle Mine

22

Neves-Corvo - Mineral Resources and Mineral Reserves1

Ownership

100%

Location

Alentejo region, Portugal

Mine life

+10 years

2020 exploration budget

$2M

P&P Zinc Mineral Reserves

2,200 kt contained (30,114 kt at 7.3%)

M&I Zinc Mineral Resources

4,938 kt contained (71,253 kt at 6.9%)

Inferred Zinc Mineral Resources

214 kt contained (3,677 kt at 5.8%)

P&P Copper Mineral Reserves

596 kt contained (29,693 kt at 2.0%)

M&I Copper Mineral Resources

1,424 kt contained (61,948 kt at 2.3%)

Inferred Copper Mineral Resources

227 kt contained (12,640 kt at 1.8%)

Inferred Semblana Copper Mineral Resources

223 kt contained (7,807 kt at 2.9%)

1. For more information refer to the NI 43-101 Technical Report for the Neves-Corvo Mine,

Portugal dated June 23, 2017 and the Company's news release dated September 8, 2020 entitled

Schematic of Neves-Corvo Mine highlighting ZEP development and mining areas

"Lundin Mining Announces 2020 Mineral Resource and Mineral Reserve Estimates" on the

Company's website (www.lundinmining.com). See also slide 25.

23

Zinkgruvan - Mineral Resources and Mineral Reserves1

Ownership

100%

Location

Askersund, Sweden

Mine life

+10 years

2020 exploration budget

$7M

P&P Zinc Mineral Reserves

690 kt contained (8,786 kt at 7.9%)

M&I Zinc Mineral Resources

1,955 kt contained (22,596 kt at 8.6%)

Inferred Zinc Mineral Resources

1,439 kt contained (18,981 kt at 7.6%)

P&P Copper Mineral Reserves

58 kt contained (3,099 kt at 1.9%)

M&I Copper Mineral Resources

92 kt contained (4,095 kt at 2.2%)

Inferred Copper Mineral Resources

5 kt contained (241 kt at 2.0%)

1. For more information please refer to the Company's Technical Report entitled NI 43- 101 Technical Report for the Zinkgruvan Mine, Central Sweden dated November 30, 2017 and the Company's news release dated September 8, 2020 entitled "Lundin Mining Announces 2020 Mineral Resource and Reserve Estimates" on the Company's website (www.lundinmining.com). See also slide 25.

Zinkgruvan Mine

24

NI 43-101 Compliance

Unless otherwise indicated, Lundin Mining Corporation (the "Company") has prepared the technical information in this presentation including Mineral Reserve and Mineral Resource estimates ("Technical Information") based on information contained in the technical reports and news releases (collectively the "Disclosure Documents") available under the Company's profile on SEDAR at www.sedar.com. Each Disclosure Document was prepared by or under the supervision of a qualified person ("Qualified Person") as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators ("NI 43-101"). For readers to fully understand the information in this presentation, they should read the technical reports identified below in their entirety, including all qualifications, assumptions and exclusions that relate to the information set out in this presentation which qualifies the Technical Information. Readers are advised that Mineral Resource estimates that are not Mineral Reserves do not have demonstrated economic viability. The Disclosure Documents are each intended to be read as a whole, and sections should not be read or relied upon out of context. The Technical Information is subject to the assumptions and qualifications contained in the Disclosure Documents.

The Technical Information in this presentation has been prepared in accordance NI 43-101 and has been reviewed and approved by Stephen Gatley, BSc (Eng), CENG MIMMM, Vice President - Technical Services of the Company, a "Qualified Person" under NI 43-101. Mr. Gatley has verified the data disclosed in this presentation and no limitations were imposed on his verification process.

Mineral Resource and Mineral Reserve estimates of the Company are shown on a 100 percent basis for each mine. The Measured and Indicated Mineral Resource estimates are inclusive of those Mineral Resource estimates modified to produce the Mineral Reserve estimates. All estimates of the Company are prepared as at June 30, 2020. Estimates for all operations are prepared by or under the supervision of a Qualified Person as defined in NI 43-101 or have been audited by independent Qualified Persons on behalf of the Company.

Mineral Reserves for all active mines have been estimated using metal prices of US$3.00/lb copper, US$1.00/lb zinc, US$0.95/lb lead, US$6.50/lb nickel and US$1,300/oz gold. Exchange rates used were EUR/USD 1.25, USD/SEK 7.00, USD/CLP 600 and USD/BRL 4.00. For the Suruca gold deposit Mineral Reserve, the metal prices used were US$3.00/lb copper and US$1,250/oz gold and an exchange rate of USD/BRL 3.95.

Candelaria and La Española open pit Mineral Resource estimates are reported within a conceptual pit shell based on metal prices of US$3.45/lb copper and US$1,300/oz gold with cut-off grades of 0.15% and 0.17% copper, respectively. Candelaria underground Mineral Resources are estimated at a cut-off grade of 0.45% copper within confining grades shells of 0.4% copper. Mineral Reserves for the Candelaria open pit, Española open pit and underground for the Candelaria property are estimated at cut-off grades of 0.16%, 0.19% and 0.50% copper, respectively. Underground Mineral Reserves for the Ojos del Salado property, Santos and Alcaparrosa mines, are estimated at cut-off grades of 0.55% copper and 0.60% copper respectively. Chapada and Suruca SW copper-gold Mineral Resource estimates are reported within a conceptual pit shell based on metal prices of US$3.45/lb copper and US$1,495/oz gold and at a variable Net Smelter Return (NSR) marginal cut-off averaging US$4.08 per tonne. For the Suruca gold only Mineral Resource estimates, cut-off grades of 0.16g/t gold for oxides and 0.23g/t for sulphides were used. Mineral Reserves for the Chapada open pit are estimated at a NSR cut-off of US$4.73 per tonne. For the Suruca gold only Mineral Reserve estimates cutoff grades of 0.19g/t gold for oxides and 0.30g/t for sulphides are used. Eagle Mineral Resources and Reserves are reported above a fixed NSR cut-off of US$108/t. The Eagle East Mineral Resources are reported above a fixed NSR cut-off of US$142/t and the Mineral Reserves are reported above US$142/t for long-hole stopes and US$150/t for cut-and-fill stopes. The NSR is calculated on a recovered payable basis considering nickel, copper, cobalt, gold and PGM grades, metallurgical recoveries, prices and realization costs. The Neves-Corvo Mineral Resources are estimated above cut-off grades of 1.0% for copper and 4.5% for zinc. The Neves-Corvo copper and zinc Mineral Reserve estimates have been calculated using variable NSR values based on area and mining method. The NSR is calculated on a recovered payable basis considering copper, lead, zinc and silver grades, metallurgical recoveries, prices and realization costs. The Neves-Corvo copper Mineral Reserves are estimated above a site average cutoff of EUR 42.0/t (grade equivalent to 1.34% copper). For Neves-Corvo zinc Mineral Reserve estimates a site average cutoff of EUR 46.6/t (grade equivalent to 5.34% zinc) is used. The Mineral Resources at Semblana are estimated above a cut-off grade of 1.0% copper. The Zinkgruvan zinc Mineral Resources are estimates within geological volumes based at a nominal NSR cut-off of SEK 350/t (equivalent to 4.5% zinc) and a minimum mining width of 5 m. The Zinkgruvan copper Mineral Resource is estimated above a cut-off grade of 1.0% Cu. The Zinkgruvan zinc and copper Mineral Reserves are estimated above a site average NSR cutoff grade of SEK 500/t (equivalent to 6.1% zinc and 1.4% copper respectively). The NSR is calculated on a recovered payable basis considering copper, lead, zinc and silver grades, metallurgical recoveries, prices and realization costs. Refer to the Company's news release dated September 8, 2020 entitled "Lundin Mining Announces 2020 Mineral Resource and Reserve Estimates" on the Company's website at www.lundinmining.com.

For further Technical Information on the Company's material properties, refer to the following technical reports, each of which is available on the Company's SEDAR profile at www.sedar.com:

Candelaria: technical report entitled Technical Report for the Candelaria Copper Mining Complex, Atacama Region, Region III, Chile dated November 28, 2018.

Chapada: technical report entitled Technical Report on the Chapada Mine, Goiás State, Brazil dated October 10, 2019

Neves-Corvo: technical report entitled NI 43-101 Technical Report for the Neves-Corvo Mine, Portugal dated June 23, 2017.

Zinkgruvan: technical report entitled NI 43-101 Technical Report for the Zinkgruvan Mine, Central Sweden dated November 30, 2017.

Eagle Mine: technical report entitled Technical Report on the Eagle Mine, Michigan, U.S.A. dated April 26, 2017.

25

www.lundinmining.com | TSX: LUN | Nasdaq Stockholm: LUMI

Attachments

  • Original document
  • Permalink

Disclaimer

Lundin Mining Corporation published this content on 10 September 2020 and is solely responsible for the information contained therein. Distributed by Public, unedited and unaltered, on 10 September 2020 12:39:07 UTC