MetalsTech Limited provided with an update on its phase III diamond drilling program at the company's 100% owned Sturec Gold Mine, located in Slovakia. Highlights: UGA-42 intersected a thick, continuous mineralized zone of 101m @ 1.32g/t Au & 18.1g/t Ag from 0m(0.25g/t Au cut-off, downhole thickness) including: 40m @ 2.09g/t Au & 23.7g/t Ag from 27m (0.5g/t Au cut-off, downhole thickness), including: 7m @ 4.48g/t Au & 13.2 g/t Ag from 41m (1g/t Au cut-off, downhole thickness); including: 4m @ 6.53g/t Au & 18.6g/t Ag from 42m (2g/t Au cut-off, downhole thickness); 4m @ 6.33g/t Au & 138.9g/t Ag from 56m (1g/t Au cut-off, downhole thickness); 2m @ 3.28g/t Au & 87.6g/t Ag from 80m (2g/t Au cut-off downhole thickness). Drilling continues underground from within the Andrej Adit at Drill Chamber IV; Deep surface drilling to commence shortly targeting depth and strike extensions beneath the existing Sturec JORC (2012) mineral resource – expected to add significant tones to the underground mining inventory; still awaiting assays from UGA-43, UGA-44,UGA-45 and UGA-46 from drill Chamber III.