Mexus Gold US announced that leaching recovery and mineral quality continue to improve at its Santa Elena mine located in Caborca, MX. Actual pad returns are up to 1.7ppm with 5 g/t head values potential. Leach flow is currently 60 gpm and the pad is currently being expanded with the of new high grade mineralized material from vein 2. The material is averaging 6.5 g/t Au and 107 g/t Ag. The company is processing 300 m3 per day yielding 5 to 6 oz gold in carbon columns. Gold sales will support continuing operations and expansion of the heap leach area as the mineral supply now supports it. Exploration company’s proposals are being welcomed as the project deserves an exhaustive evaluation of the evident mineral potential.