NTPC Limited announced that, operation of NTPC Barauni Thermal Power Station Stage-I (2x110 MW) comprising of two Units (Unit 6 & 7) of 110 MW each (along with all Auxiliary systems except CHP, Switchyard, Ash Dyke and Township) shall be permanently discontinued with effect from 31 March 2024.