NV Gold Corporation announced the completion of its 720-meter drilling program (the "Drilling Program") on its 100%-owned Triple T Project in Nevada as previously announced January 25th, 2023. The completion of this Reverse Circulation drilling represents the continuation of its recent work to expand and confirm mineralization first identified in wide-spaced drilling by the Company in 2009. Highlights of the recent drilling include: 720 metres of Reverse Circulation drilled in 14 shallow drill-holes in three target areas; Intersection of several near-surface mineralized quartz veins; Confirmation of low-angle thrust plane and identification of controls of mineralization; North Target area now measures 200 by 500 meters and remains open to the north and south as well as down-dip to the east.